Do you have any question about this error?
Message type: E = Error
Message class: CK - Product Costing Messages
Message number: 727
Message text: Lot size cannot be passed on in combination with mixed costing
For <DS:GLOS.costing_variant>costing variant</> &V1& and
<DS:GLOS.costing_version>costing version</> &V2&, it was defined in
Customizing that a <DS:GLOS.mixed_costing>mixed cost estimate</> should
be created for quantity structure category &V3&. At the same time, it
was defined in the costing variant that the
<DS:DE.CK_LOSDR>Pass_on_lot_size</> function should be active.
Mixed costing cannot be carried out simultaneously with <LS>Pass on lot
size </>. Costing cannot be proceeded with.
Change the Customizing settings for costing variant &V1&.
Error message extract from SAP system. Copyright SAP SE.
CK727
- Lot size cannot be passed on in combination with mixed costing ?The SAP error message CK727, which states "Lot size cannot be passed on in combination with mixed costing," typically occurs in the context of product costing and inventory management. This error arises when there is an attempt to use a lot size that is incompatible with the mixed costing method in SAP.
Cause:
- Mixed Costing Configuration: Mixed costing allows for the valuation of materials using different cost components (e.g., standard costs, moving average costs). If the lot size defined for a material does not align with the requirements of mixed costing, this error can occur.
- Lot Size Settings: The lot size settings in the material master or the costing variant may not be compatible with the mixed costing approach. For example, if the lot size is set to a fixed quantity that does not allow for the flexibility required by mixed costing, the error will be triggered.
- Costing Variant: The costing variant used may not be configured to handle the specific lot size or mixed costing scenario.
Solution:
- Review Lot Size Settings: Check the lot size settings in the material master (transaction MM02) and ensure they are appropriate for mixed costing. You may need to adjust the lot size to a variable or appropriate type that supports mixed costing.
- Adjust Costing Variant: Review the costing variant settings (transaction OKKN) to ensure that it is configured to handle mixed costing and the specific lot size you are trying to use.
- Check Material Master Data: Ensure that the material master data is correctly set up for mixed costing. This includes checking the valuation class, costing type, and any other relevant fields.
- Consult Documentation: Refer to SAP documentation or help resources for specific guidelines on configuring mixed costing and lot sizes.
- Testing: After making changes, perform a test run of the costing to ensure that the error does not reoccur.
Related Information:
If the issue persists after following these steps, it may be beneficial to consult with an SAP expert or your organization's SAP support team for further assistance.
Get instant SAP help. Start your 7-day free trial now.
CK726
Qty structure type was changed between selection/explosion and costing
What causes this issue? Between selection/structure explosion of a costing run and costing, or between two costing phases, the Customizing settings f...
CK725
Quantity structure type was changed between selection and explosion
What causes this issue? Between selecting a costing run and exploding the structure, the Customizing settings for a <DS:GLOS.mixed_costing>mixe...
CK728
Lot size entered ignored by mixed cost estimate
What causes this issue? You have entered a lot size in the request screen.System Response The system is aware that a mixed cost estimate is to creat...
CK729
Costing view could not be created
What causes this issue? The system has attempted to create a costing view in the material master record.System Response The following error occurred...
Click on this link to search all SAP messages.