Do you have any question about this error?
Message type: E = Error
Message class: CB - PP-PI-PMA: Dialog Messages for Process Management
Message number: 521
Message text: Specify operation or phase number
The selected process message has the destination &V1& assigned to it.
Messages which are to be processed by this destination must contain
either an operation number or a phase number. However, the selected
message does not contain any of these numbers.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
If the message has not yet been sent to another destination, correct
and send it from the message monitor.
Otherwise, manually post the data if necessary.
Error message extract from SAP system. Copyright SAP SE.
CB521
- Specify operation or phase number ?The SAP error message CB521 ("Specify operation or phase number") typically occurs in the context of production planning or process order management within SAP. This error indicates that the system requires a specific operation or phase number to proceed with a particular action, such as creating or modifying a production order or process order.
Cause:
- Missing Operation/Phase Number: The most common cause of this error is that the operation or phase number has not been specified in the relevant transaction or screen.
- Incorrect Configuration: There may be issues with the configuration of the routing or the production order that does not properly define the operations or phases.
- Data Entry Error: Users may have inadvertently skipped entering the required operation or phase number when creating or modifying an order.
Solution:
- Specify the Operation/Phase Number: When prompted with this error, ensure that you enter the required operation or phase number in the relevant field. This is often found in the production order or routing screens.
- Check Routing: Verify that the routing for the material in question is correctly defined and that all necessary operations and phases are included.
- Review Order Details: If you are working with a production order, check the details of the order to ensure that all required fields are filled out correctly.
- Consult Documentation: If you are unsure about the required operation or phase numbers, refer to the relevant SAP documentation or consult with a colleague who is familiar with the production process.
- System Configuration: If the issue persists, it may be necessary to review the system configuration or consult with an SAP Basis or technical consultant to ensure that everything is set up correctly.
Related Information:
If the problem continues after following these steps, it may be beneficial to engage with your SAP support team for further assistance.
Get instant SAP help. Start your 7-day free trial now.
CB520
Phase & not created in order &
What causes this issue? In the selected process message, phase &V1& is specified for order &V2&. However, this phase is not containe...
CB519
Reservation item for material & is not unique
What causes this issue? With the selected process message, material consumption data is transferred to destination &V2&. However, the messag...
CB522
Component is to be backflushed, no goods issue posting
What causes this issue? With the selected process message, a goods issue for an order is reported to the warehouse (destination &V3&). Howev...
CB523
Item number in material document: &
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.