Do you have any question about this error?
Message type: E = Error
Message class: AP_COPY - Copying Function for Plan/Budget
Message number: 025
Message text: Order &1: budget not ready for input
The budget of order &V1& should be changed automatically.
However, the overall or annual budget of order &V1& is <ZH>not</> ready
for input if the corresponding manual budgeting function was being
used. Therefore the automatic change to the budget is also <ZH>not</>
possible.
The budget of order &V1& is not changed.
The reason the order budget is not ready for input is usually that a
program type for investment programs is entered in the budget profile
of the order. As a result, the order cannot be budgeted until it is
assigned to a program position of an investment program of this program
type.
Assign the order to an appropriate investment program position.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
AP_COPY025
- Order &1: budget not ready for input ?The SAP error message AP_COPY025, which states "Order &1: budget not ready for input," typically occurs in the context of budget management within SAP, particularly when dealing with internal orders or project systems. This error indicates that the budget for the specified order is not available for input, which can prevent users from posting expenses or making changes related to that order.
Causes:
- Budget Not Released: The budget for the order has not been released or is not available for the current period.
- Budget Availability Control: The budget availability control settings may not be configured correctly, or the budget may have been exhausted.
- Order Status: The order may be in a status that does not allow for budget postings (e.g., closed or completed).
- Fiscal Year/Period Issues: The fiscal year or period may be closed, preventing any budget-related postings.
- Configuration Issues: There may be issues with the configuration of the budget management settings in the system.
Solutions:
- Check Budget Release: Ensure that the budget for the order has been released. You can do this by navigating to the relevant transaction (e.g., KOB1 for order reports) and checking the budget status.
- Review Availability Control Settings: Verify the availability control settings for the order type and ensure that they are set up correctly.
- Change Order Status: If the order is in a status that does not allow postings, consider changing the status if appropriate.
- Open Fiscal Year/Period: Check if the fiscal year or period is open for posting. If it is closed, you may need to open it or wait until the next period.
- Consult Configuration: If you suspect configuration issues, consult with your SAP configuration team to review the settings related to budget management and availability control.
Related Information:
If the issue persists after checking the above points, it may be beneficial to consult with your SAP support team or a functional consultant who specializes in controlling (CO) or project systems (PS) for further assistance.
Get instant SAP help. Start your 7-day free trial now.
AP_COPY024
Only plan version 0 allowed for program type &1
What causes this issue? You want to work with a plan version other than 0 for an investment program that has program type &V1&. However, this...
AP_COPY023
Adjustment amount for year &1: &2 (&3)
What causes this issue? The consistency check discovered an error in annual value &V1&.System Response The system proposes an adjustment ite...
AP_COPY026
Project &1: budget partially or completely not ready for input
What causes this issue? The budget of project &V1& should be changed automatically. However, the overall or annual budget of one or all WBS e...
AP_COPY027
Inv. program &1/&2, position &3: overall budget exceeded
What causes this issue? As a result of automatic budgeting of measures belonging to program position &V3& of investment program &V1&/...
Click on this link to search all SAP messages.