How To Fix AP_COPY026 - Project &1: budget partially or completely not ready for input


SAP Error Message - Details

  • Message type: E = Error

  • Message class: AP_COPY - Copying Function for Plan/Budget

  • Message number: 026

  • Message text: Project &1: budget partially or completely not ready for input

  • Show details Hide details
  • What causes this issue?

    The budget of project &V1& should be changed automatically.
    However, the overall or annual budget of one or all WBS elements of
    project &V1& is <ZH>not</> ready for input if the corresponding manual
    budgeting function was being used. Therefore the automatic change to
    the budget is also <ZH>not</> possible.

    System Response

    The budget of project &V1& is not changed.

    How to fix this error?

    The reason the budget of one or all of the WBS elements is not ready
    for input is usually that a program type for investment programs is
    entered in the budget profile of the project. As a result, a WBS
    element of project &V1& cannot be budgeted until it (or a WBS element
    superior in the hierarchy) is assigned to a program position of an
    investment program of this program type.
    Assign the WBS elements of project &V1& to appropriate investment
    program positions.

    Procedure for System Administrators

    The system issues an error message and will not allow you to continue with this transaction until the error is resolved.


    Error message extract from SAP system. Copyright SAP SE.


Smart SAP Assistant

  • What is the cause and solution for SAP error message AP_COPY026 - Project &1: budget partially or completely not ready for input ?

    The SAP error message AP_COPY026 indicates that there is an issue with the budget for a specific project. The message states that the budget is either partially or completely not ready for input, which means that the system is unable to process budget-related transactions for that project.

    Cause:

    1. Budget Not Released: The budget for the project may not have been released or approved yet. In SAP, budgets need to be released before they can be used for planning or posting.
    2. Budget Availability Control: The budget availability control settings may not be properly configured, leading to restrictions on budget usage.
    3. Project Status: The project might be in a status that does not allow budget input, such as being in a closed or inactive state.
    4. Missing Budget Data: There may be missing or incomplete budget data for the project, which prevents the system from recognizing the budget as ready for input.
    5. Authorization Issues: The user may not have the necessary authorizations to input or modify the budget for the project.

    Solution:

    1. Check Budget Status: Verify if the budget for the project has been released. If not, follow the necessary steps to release the budget.
    2. Review Availability Control Settings: Ensure that the budget availability control settings are correctly configured for the project.
    3. Project Status Check: Check the status of the project in the system. If the project is inactive or closed, you may need to reactivate it or create a new project.
    4. Complete Budget Data: Ensure that all required budget data is entered and complete. This may involve checking the budget planning transactions.
    5. Authorization Check: Confirm that the user has the appropriate authorizations to perform budget-related transactions for the project. If not, contact your SAP security administrator to obtain the necessary permissions.

    Related Information:

    • Transaction Codes: You may need to use transaction codes such as CJ30 (Project Budgeting) or CJ02 (Change Project) to check and modify budget settings.
    • SAP Notes: Check for any relevant SAP Notes that may address specific issues related to budget management in your version of SAP.
    • Documentation: Refer to SAP documentation or user manuals for detailed procedures on budget management and project control.

    If the issue persists after checking the above points, it may be beneficial to consult with your SAP support team or a functional consultant who specializes in project systems and budgeting.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author