How To Fix AP_COPY010 - Budget/release was changed - rebuild availability control, if necessary


SAP Error Message - Details

  • Message type: E = Error

  • Message class: AP_COPY - Copying Function for Plan/Budget

  • Message number: 010

  • Message text: Budget/release was changed - rebuild availability control, if necessary

  • Show details Hide details
  • What causes this issue?

    Automatic budget adjustments were carried out for measures (orders or
    WBS elements), or budget releases of WBS elements were automatically
    changed.
    However, there was <ZH>no</> automatic adjustment to the data of the
    availability control.
    This is the case, even if activation type 1 (automatic activation during
    budget allocation) is set for availability control in the budget profile
    of the measure.

    How to fix this error?

    Rebuild the data of the availability control for the measures that were
    processed, if necessary. To do so, you can use transaction CJBN (WBS
    elements) or transaction KO31 (orders).

    Error message extract from SAP system. Copyright SAP SE.


Smart SAP Assistant

  • What is the cause and solution for SAP error message AP_COPY010 - Budget/release was changed - rebuild availability control, if necessary ?
    The SAP error message AP_COPY010 indicates that there has been a change in the budget or release status of a budget in the system, which may require a rebuild of the availability control (AVC) to ensure that the budgetary control is accurate and reflects the current state of the budget.
    
    Cause: Budget Changes: The budget or release status has been modified after the initial allocation or posting, which can lead to inconsistencies in the availability control. Data Migration or Updates: Changes made during data migration or updates to budgetary data can trigger this message. Configuration Changes: Changes in configuration settings related to budget control or availability control can also lead to this error.
    Solution: To resolve the AP_COPY010 error, you can follow these steps: Rebuild Availability Control: Navigate to the transaction code S_ALR_87013558 (or use the appropriate transaction for your version of SAP). Execute the report to rebuild the availability control. This process will update the budgetary control data

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author