Message text: Variant &1 has cost estimate - no longer possible to adopt plan values
Variant &v1& has a cost estimate. For variants with a cost estimate, it
is only possible for measures to adopt plan values when the measure is
created from within the appropriation request.
Action is terminated.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
AO610
- Variant &1 has cost estimate - no longer possible to adopt plan values ?The SAP error message AO610 indicates that a specific variant (identified by &1) has an associated cost estimate, which prevents the adoption of planned values. This typically occurs in the context of Asset Accounting (FI-AA) when trying to transfer planned values to actual values or when attempting to adopt planned values for an asset that already has a cost estimate.
Cause:
- Existing Cost Estimate: The asset in question has an existing cost estimate that is preventing the adoption of new planned values.
- Inconsistent Data: There may be inconsistencies in the asset master data or the cost estimate that need to be resolved.
- Incorrect Configuration: The configuration settings in Asset Accounting may not allow for the adoption of planned values under certain conditions.
Solution:
- Check Cost Estimate: Review the cost estimate associated with the asset. If it is no longer needed, consider reversing or deleting it if appropriate.
- Review Asset Master Data: Ensure that the asset master data is consistent and correctly configured. Check for any discrepancies that might be causing the issue.
- Adjust Configuration: If the configuration settings in Asset Accounting are preventing the adoption of planned values, consult with your SAP configuration team to adjust the settings as necessary.
- Use Transaction Codes: Utilize relevant transaction codes such as:
- AS02: Change Asset Master Data
- CK11N: Create Cost Estimate
- CJ20N: Project Management (if applicable)
- Consult Documentation: Refer to SAP documentation or notes related to Asset Accounting for any specific guidelines or updates that may address this issue.
Related Information:
If the issue persists after following these steps, it may be beneficial to consult with your SAP support team or a consultant who specializes in Asset Accounting for further assistance.
Get instant SAP help. Start your 7-day free trial now.
AO609
WBS element &1 has cost estimate - not possible to adopt plan values
What causes this issue? Costing was already entered in the Project Builder for WBS element &v1& . It is not possible to adopt more plan value...
AO608
App. req. &1 has variant(s) with cost estimate - transaction not possible
What causes this issue? Appropriation request &v1& has at least one variant with a cost estimate. For appropriation requests of this kind, it...
AO611
Order &1 has cost estimate - no longer possible to adopt plan values
What causes this issue? An EasyCostPlanning cost estimate was already entered for order &v1&. It is no longer possible for this order to adop...
AO612
Cost estimate not found
What causes this issue? A cost estimate, which is not on the database, is assigned to a variant of the appropriation request.System Response Process...