Message type: E = Error
Message class: CY - Capacity Requirements Planning
Message number: 346
Message text: El grafo &/&: la fecha de fin es anterior a la fecha de limitación
The finish date for the operation has the constraint that it should not
be before a particular date (constraint date). However the start date
when you want to dispatch the operation leads to a finish date which is
before the constraint date. Therefore it is not possible to
dispatch the operation.
You should change the start date so that the operation finishes before
the constraint date.
Extracto de mensaje de error del sistema SAP. Copyright SAP SE.
CY346
- El grafo &/&: la fecha de fin es anterior a la fecha de limitación ?Get instant SAP help. Start your 7-day free trial now.
CY345
El grafo &/&: la fecha de fin difiere de la fecha de limitación
¿Qué causa este problema? The start date for the operation has the constraint that it should finish on a particular date (constraint date). However...
CY344
El grafo &/&: la fecha de inico es posterior a fecha de limitación
¿Qué causa este problema? The start date for the operation has the constraint that it should not be after a particular date (constraint date). Howe...
CY347
El grafo &/&: la fecha de fin es posterior a la fecha de limitación
¿Qué causa este problema? The finish date for the operation has the constraint that it should not finish after a particular date (constraint date)....
CY348
El puesto de trabajo & en el centro & está bloqueado
¿Qué causa este problema? You are trying to dispatch the capacity requiements to the work center &V1& in plant &V2&. However this w...
Haga clic en este enlace para buscar todos los mensajes de SAP.