Do you have any question about this error?
Message type: E = Error
Message class: 29 - Bills of Material
Message number: 245
Message text: No esta prevista la unidad de medida & (pos.: & &/centro &)
You want to allocate the BOM to plant &V4&.
The BOM contains material item &V2& &V3&, which has unit of measure
&V1&.
However, this unit of measure is different from the stockkeeping unit
or unit of issue in material master &V3& in plant &V4& and cannot be
converted into either of these units.
You can only allocate the BOM to plant &V4& if the units of measure are
either identical or can be converted to each other.
Extracto de mensaje de error del sistema SAP. Copyright SAP SE.
29245
- No esta prevista la unidad de medida & (pos.: & &/centro &) ?Get instant SAP help. Start your 7-day free trial now.
29244
Cuenta-mayor & no está prevista en sociedad & (centro & ) (pos.: &)
¿Qué causa este problema? You want to allocate the BOM to plant &V3&. The BOM contains a non-stock item for which a cost element was entere...
29243
Tipo-material & y tipo-posición & son incompatibles (pos.: & &)
¿Qué causa este problema? You want to allocate the BOM to an additional plant. The BOM contains a material item with material type &V1& and...
29246
Clave distribución & no está prevista en el centro & (Pos.: &)
¿Qué causa este problema? You want to allocate the BOM to plant &V2&. Item &V3& of the BOM contains a material for which material r...
29247
La organización de compras & en el centro & no es posible (pos.: &)
¿Qué causa este problema? You want to allocate the BOM to plant &V2&. Item &V3& contains purchasing organization &V1&, whic...
Haga clic en este enlace para buscar todos los mensajes de SAP.