Message type: E = Error
Message class: 29 - Bills of Material
Message number: 246
Message text: Clave distribución & no está prevista en el centro & (Pos.: &)
You want to allocate the BOM to plant &V2&.
Item &V3& of the BOM contains a material for which material
requirements for repetitive manufacturing and continuous flow
production are planned using distribution key &V1&.
However, this distribution key is not defined in plant &V2&.
You can only allocate the BOM to plant &V2& if the distribution key is
defined in this plant.
Extracto de mensaje de error del sistema SAP. Copyright SAP SE.
Get instant SAP help. Sign up for our Free Essentials Plan.
29245 No esta prevista la unidad de medida & (pos.: & &/centro &)
¿Qué causa este problema? You want to allocate the BOM to plant &V4&. The BOM contains material item &V2& &V3&, which has u...
29244 Cuenta-mayor & no está prevista en sociedad & (centro & ) (pos.: &)
¿Qué causa este problema? You want to allocate the BOM to plant &V3&. The BOM contains a non-stock item for which a cost element was entere...
29247 La organización de compras & en el centro & no es posible (pos.: &)
¿Qué causa este problema? You want to allocate the BOM to plant &V2&. Item &V3& contains purchasing organization &V1&, whic...
29248 No está previsto el almacén & para el mat & en el centro & (pos.:&)
¿Qué causa este problema? You want to allocate the BOM to plant &V3&. Storage location &V1& is entered for material &V2&. H...
Haga clic en este enlace para buscar todos los mensajes de SAP.