Do you have any question about this error?
Message type: E = Error
Message class: 29 - Bills of Material
Message number: 244
Message text: Cuenta-mayor & no está prevista en sociedad & (centro & ) (pos.: &)
You want to allocate the BOM to plant &V3&. The BOM contains a
non-stock item for which a cost element was entered.
The cost element entered refers to a direct cost. In this case, the
system checks whether G/L account &V1& exists in the determined company
code &V2& (plant &V3&).
As it does not exist, you cannot allocate the BOM to plant &V3&.
If you want to allocate the BOM to plant &V3&, first you have to
maintain G/L account &V1& in this plant.
Extracto de mensaje de error del sistema SAP. Copyright SAP SE.
29244
- Cuenta-mayor & no está prevista en sociedad & (centro & ) (pos.: &) ?Get instant SAP help. Start your 7-day free trial now.
29243
Tipo-material & y tipo-posición & son incompatibles (pos.: & &)
¿Qué causa este problema? You want to allocate the BOM to an additional plant. The BOM contains a material item with material type &V1& and...
29242
Mat.& no está previsto p. pos LMat debido al status mat & '&' (centro &)
¿Qué causa este problema? You want to allocate the BOM to plant &V4&. The BOM contains material item &V1&. In plant &V4&, t...
29245
No esta prevista la unidad de medida & (pos.: & &/centro &)
¿Qué causa este problema? You want to allocate the BOM to plant &V4&. The BOM contains material item &V2& &V3&, which has u...
29246
Clave distribución & no está prevista en el centro & (Pos.: &)
¿Qué causa este problema? You want to allocate the BOM to plant &V2&. Item &V3& of the BOM contains a material for which material r...
Haga clic en este enlace para buscar todos los mensajes de SAP.