Stop googling SAP errors. Use our Free Essentials plan instead - no credit card needed. Start Now

Close

How To Fix WRF_BUDGET059 - &1 plan PPW values were updated


SAP Error Message - Details

  • Message type: E = Error

  • Message class: WRF_BUDGET -

  • Message number: 059

  • Message text: &1 plan PPW values were updated

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message WRF_BUDGET059 - &1 plan PPW values were updated ?

    Certainly! Here's a detailed explanation regarding the SAP error message WRF_BUDGET059:


    SAP Error Message: WRF_BUDGET059

    Message Text:
    &1 plan PPW values were updated


    1. Cause

    • The message WRF_BUDGET059 is an informational or warning message rather than a critical error.
    • It indicates that during a budget planning or update process, a certain number (&1) of plan PPW (Plan Periodic Work) values have been updated in the system.
    • This message typically appears in the context of budget planning, budget control, or commitment management in SAP, especially when working with Funds Management (FM) or Project System (PS) modules.
    • The system is informing the user that the planned values for PPW (which could be planned work, planned costs, or planned quantities depending on configuration) have been changed as part of the current operation.
    • The update might be triggered by:
      • Manual adjustments in budget planning.
      • Automatic recalculations during budget release or transfer.
      • Integration processes updating plan values from other modules or external systems.

    2. Solution

    • Since this is an informational message, no corrective action is usually required unless the update was unexpected.
    • Verify the changes:
      • Check the updated PPW values to ensure they are correct and consistent with your planning objectives.
      • Review the budget plan or commitment documents to confirm the updates.
    • If the updates are unexpected or incorrect:
      • Investigate the source of the update (e.g., user input, interface, background job).
      • Check for any recent changes in configuration or master data that might affect budget planning.
      • Review related change logs or audit trails.
    • If necessary, revert or adjust the plan values manually or through a corrective planning cycle.
    • Consult with your SAP FI/CO or PS consultant if the updates impact financial controlling or project budgeting significantly.

    3. Related Information

    • Module Context:

      • Funds Management (FM)
      • Project System (PS)
      • Controlling (CO) - Budgeting and Planning
    • Transaction Codes:

      • FMBB - Budgeting
      • FMAVCR01 - Budget Availability Control
      • CJ30 - Project Budgeting
      • CJ31 - Project Budget Planning
    • Notes and Documentation:

      • Check SAP Notes related to budget planning and PPW updates for your SAP version.
      • Review SAP Help Portal documentation on Funds Management and Project System budgeting.
    • Technical Details:

      • The message class WRF_BUDGET relates to budget functions.
      • The placeholder &1 is replaced by the number of plan PPW values updated.

    Summary

    Aspect Details
    Message WRF_BUDGET059
    Type Informational / Warning
    Cause System updated a number of plan PPW values during budget planning or update process.
    Solution Verify updated values; no action if expected. Investigate if unexpected.
    Related Funds Management, Project System, Budget Planning transactions

    If you want, I can help you with specific steps to check the updated values or how to trace the source of the update in your SAP system. Just let me know!

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant