Stop googling SAP errors. Use our Free Essentials plan instead - no credit card needed. Start Now

Close

How To Fix WRF_APC367 - Planned structured material &1 cannot be added into a purchasing list


SAP Error Message - Details

  • Message type: E = Error

  • Message class: WRF_APC - Messages for Operational Assortment Planning and Control

  • Message number: 367

  • Message text: Planned structured material &1 cannot be added into a purchasing list

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message WRF_APC367 - Planned structured material &1 cannot be added into a purchasing list ?

    SAP Error Message:
    WRF_APC367Planned structured material &1 cannot be added into a purchasing list


    Cause:

    This error occurs when you try to add a planned structured material (a material with a Bill of Materials (BOM) or a configurable material) directly into a purchasing list. In SAP, planned structured materials are not allowed to be directly procured or added to purchasing lists because they are typically assembled or produced internally from components rather than purchased as a whole.


    Explanation:

    • Planned structured materials are materials that have a BOM or are configurable and are planned as assemblies or kits.
    • Purchasing lists are intended for materials that can be directly procured from vendors.
    • Since planned structured materials are not procured directly but rather produced or assembled, SAP restricts their addition to purchasing lists to avoid procurement errors or inconsistencies.

    Solution:

    1. Check the material master:

      • Verify if the material is marked as a planned structured material (e.g., it has a BOM or is configurable).
    2. Adjust procurement strategy:

      • Instead of adding the planned structured material to the purchasing list, add its components or individual purchasable materials.
      • If the material should be procured directly, ensure it is not maintained as a planned structured material (i.e., remove BOM/configuration if applicable).
    3. Review business process:

      • Confirm whether the material should be produced in-house or purchased.
      • If the material is to be purchased, consider creating a separate material master without BOM/configuration.
    4. Alternative approach:

      • Use production orders or planned orders to produce the structured material internally.
      • Purchase components separately based on the BOM.

    Related Information:

    • Material Master Views: Check the MRP and BOM views to understand the material's structure.
    • BOM (Bill of Materials): Structured materials have BOMs that define their components.
    • Purchasing Lists: Used to group materials for procurement; only direct purchasable materials should be included.
    • SAP Notes: Check SAP OSS notes or support portal for any updates or patches related to this error.
    • Transaction Codes:
      • CS03 – Display BOM
      • MM03 – Display Material Master
      • ME01 – Maintain Purchasing Info Records / Purchasing Lists

    Summary:

    • Cause: Attempt to add a planned structured material (with BOM/configuration) to a purchasing list.
    • Solution: Add only purchasable components to the purchasing list; do not add the structured material itself.
    • Additional: Review material master and procurement strategy to align with business processes.

    If you need further assistance, please provide details about the material type, procurement type, and the transaction where the error occurs.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker