How To Fix WG354 - Max. period of coverage of &3 days reached for material &1, plant &2.


SAP Error Message - Details

  • Message type: E = Error

  • Message class: WG - Messages for store order and investment buy

  • Message number: 354

  • Message text: Max. period of coverage of &3 days reached for material &1, plant &2.

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message WG354 - Max. period of coverage of &3 days reached for material &1, plant &2. ?

    Certainly! Here's a detailed explanation for the SAP error message:


    SAP Error Message:

    WG354 Max. period of coverage of &3 days reached for material &1, plant &2.


    Meaning / Cause:

    This error occurs in the Material Requirements Planning (MRP) or Forecasting process when the system detects that the maximum allowed period of coverage for a material in a specific plant has been exceeded.

    • Material &1: The material number for which the error is triggered.
    • Plant &2: The plant where the material is managed.
    • &3 days: The maximum allowed period of coverage (in days) that has been set for this material.

    The "period of coverage" refers to the time span for which the current stock and planned receipts can cover the demand. If the system finds that the coverage period exceeds the maximum allowed limit, it raises this warning/error.

    This is typically controlled by parameters in the material master or MRP settings to avoid excessive stock or planning beyond a reasonable horizon.


    Common Causes:

    • The period of coverage parameter is set too low for the material, but the current stock and planned receipts cover demand for a longer period.
    • Incorrect or overly restrictive settings in the material master or MRP parameters.
    • Forecast or demand data might be low or zero, causing the system to calculate a very long coverage period.
    • Planning horizon or lot sizing settings might cause the system to plan too far ahead.

    Where is this controlled?

    • Material Master (MRP 2 view): Field Period of Coverage (usually in days).
    • MRP Parameters: Settings that influence coverage calculations.
    • Forecast profiles or planning parameters that influence demand and coverage.

    Solution / How to fix:

    1. Check the Period of Coverage setting:

      • Go to transaction MM02 (Change Material Master).
      • Navigate to the MRP 2 view.
      • Check the field Period of Coverage (usually field name: BESKZ or similar).
      • Increase the value if it is set too low and the actual coverage period is legitimately longer.
    2. Review Demand and Stock Situation:

      • Check if the demand is unusually low or zero, causing the coverage period to be very long.
      • Adjust forecast or demand data if necessary.
    3. Adjust MRP Parameters:

      • Review lot sizing and planning horizon parameters.
      • Adjust if they cause planning beyond the desired coverage period.
    4. If the message is a warning and not an error:

      • You may choose to ignore it if the coverage period is acceptable for your business process.
    5. Check Customizing:

      • Sometimes, the maximum period of coverage is controlled via customizing or user exits.
      • Review if any user exits or BAdIs are enforcing this limit.

    Additional Information:

    • This message is part of the Forecasting and Planning checks to ensure realistic planning horizons.
    • It helps prevent overstocking or planning errors by limiting how far ahead the system plans.
    • If you frequently encounter this message, consider reviewing your overall planning strategy and parameters.

    Summary:

    Aspect Details
    Message Number WG354
    Cause Maximum allowed period of coverage exceeded for material in plant.
    Solution Increase period of coverage in material master or adjust planning parameters.
    Transaction to check MM02 (Material Master), MD04 (Stock/Requirements List)
    Related Areas MRP, Forecasting, Material Master Data, Planning Parameters

    If you need help with specific transaction codes or customizing paths, feel free to ask!

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant