How To Fix WG353 - Max.coverage is &3 days for material &1, plant &2, iteration &4 days


SAP Error Message - Details

  • Message type: E = Error

  • Message class: WG - Messages for store order and investment buy

  • Message number: 353

  • Message text: Max.coverage is &3 days for material &1, plant &2, iteration &4 days

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message WG353 - Max.coverage is &3 days for material &1, plant &2, iteration &4 days ?

    The SAP error message:

    WG353 Max.coverage is &3 days for material &1, plant &2, iteration &4 days

    typically occurs in the context of SAP's Repetitive Manufacturing (REM) or Production Planning (PP) processes, especially during the calculation of production quantities or coverage periods.


    Meaning of the Message

    • Message Text:
      "Max.coverage is &3 days for material &1, plant &2, iteration &4 days"

    • Variables:

      • &1 = Material number
      • &2 = Plant
      • &3 = Maximum allowed coverage period (in days)
      • &4 = Current iteration coverage period (in days)

    This message indicates that during the planning or calculation run, the system has detected that the coverage period (the time span for which demand is covered by planned production) for the specified material and plant has exceeded the maximum allowed coverage period.


    Cause

    • The coverage period (the time horizon for which demand is planned to be covered) calculated in the current iteration (&4 days) exceeds the maximum allowed coverage period (&3 days) set in the system.
    • This usually happens during the repetitive manufacturing planning run or demand coverage calculation when the system tries to plan production for a period longer than what is configured as acceptable.
    • The maximum coverage period is a control parameter to avoid planning too far into the future, which could lead to inaccurate or inefficient production plans.

    Where is this parameter maintained?

    • The maximum coverage period is typically maintained in the repetitive manufacturing parameters or planning parameters for the material or plant.
    • It can be set in customizing under:
      SPRO -> Production -> Repetitive Manufacturing -> Planning -> Define Maximum Coverage Period

    Solution

    1. Check and adjust the maximum coverage period:

      • Go to the customizing path mentioned above.
      • Review the maximum coverage period set for the material and plant.
      • If the business process requires a longer coverage period, increase the maximum coverage period accordingly.
    2. Review the demand and planning horizon:

      • Check if the demand or forecast data is causing the system to plan too far ahead.
      • Adjust the demand or forecast horizon if necessary.
    3. Check the planning run parameters:

      • Sometimes, the planning run or the repetitive manufacturing planning run parameters specify a coverage period.
      • Adjust these parameters to align with the maximum coverage period.
    4. Review the material master and planning data:

      • Check if the material master data (MRP type, lot size, planning horizon) is set correctly.
      • Incorrect settings can cause the system to plan beyond the allowed coverage.

    Additional Information

    • This message is informational but indicates a planning inconsistency that should be addressed to ensure efficient production planning.
    • Ignoring this message may lead to production plans that are not realistic or that cover too long a period, causing inventory or capacity issues.
    • If you are unsure about changing the maximum coverage period, consult with your production planning or SAP PP consultant.

    Summary

    Aspect Details
    Cause Coverage period in planning exceeds max allowed
    Effect Planning run stops or warns about coverage limit
    Solution Increase max coverage period or adjust planning parameters
    Customization SPRO -> Production -> Repetitive Manufacturing -> Planning -> Define Maximum Coverage Period

    If you need help with the exact customizing steps or transaction codes, feel free to ask!

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker