Do you have any question about this error?
Stop googling SAP errors. Use our Free Essentials plan instead - no credit card needed. Start Now →
Message type: E = Error
Message class: VMP_MSG - VMP Message Manager
Message number: 167
Message text: Change number not valid for mbom alternative &1
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
VMP_MSG167
- Change number not valid for mbom alternative &1 ?The SAP error message VMP_MSG167 ("Change number not valid for MBOM alternative &1") typically occurs in the context of managing Manufacturing Bill of Materials (MBOM) and change management within SAP. This error indicates that the change number you are trying to use is not valid for the specified MBOM alternative.
Causes:
- Invalid Change Number: The change number you are trying to use may not be valid for the specific MBOM alternative you are working with.
- Change Number Status: The change number might be in a status that does not allow it to be used (e.g., it may be inactive or not released).
- MBOM Alternative Not Configured: The MBOM alternative you are referencing may not be properly configured to accept the change number.
- Authorization Issues: There may be authorization issues preventing the use of the change number.
- Incorrect Configuration: The configuration settings for the change management process may not be set up correctly.
Solutions:
- Verify Change Number: Check if the change number you are using is valid and active. You can do this by navigating to the change management transaction in SAP and verifying the status of the change number.
- Check MBOM Alternative: Ensure that the MBOM alternative you are trying to modify is correctly set up to accept the change number. You may need to review the configuration of the MBOM.
- Change Number Status: Make sure that the change number is in a status that allows it to be used. If it is not released, you may need to release it first.
- Authorization Check: Ensure that you have the necessary authorizations to use the change number. You may need to consult with your SAP security team if you suspect authorization issues.
- Consult Documentation: Review SAP documentation or help resources related to change management and MBOM to ensure that you are following the correct procedures.
- Contact Support: If the issue persists, consider reaching out to your SAP support team or consulting with SAP support for further assistance.
Related Information:
CS01
(Create BOM), CS02
(Change BOM), and CS03
(Display BOM) to manage BOMs effectively.By following these steps, you should be able to identify the cause of the error and implement a solution to resolve it.
Get instant SAP help. Sign up for our Free Essentials Plan.
VMP_MSG166
No authorization to delete planned BOMs
What causes this issue? You do not have authorization to delete planned BOMs.System Response The system issues an error message and will not allow y...
VMP_MSG165
Select only one assembly node to plan as designed
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
VMP_MSG168
Selection restricted to 200 hits
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
VMP_MSG169
Planning scope alternative with status 'In process' cannot be deleted
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.