How To Fix /SMB/FUNCTION_SWITCH013 - Open change project exists, no switch to new Q2P possible


SAP Error Message - Details

  • Message type: E = Error

  • Message class: /SMB/FUNCTION_SWITCH -

  • Message number: 013

  • Message text: Open change project exists, no switch to new Q2P possible

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SMB/FUNCTION_SWITCH013 - Open change project exists, no switch to new Q2P possible ?
    The SAP error message /SMB/FUNCTION_SWITCH013 indicates that there is an open change project in the system, which prevents the switch to a new Quality to Production (Q2P) process. This error typically arises in the context of SAP S/4HANA or SAP Business Suite systems when trying to perform a switch or transport that requires a clean state without any ongoing changes.
    
    Cause: Open Change Projects: The primary cause of this error is that there is an active change project that has not been completed or released. Change projects are used to manage modifications and enhancements in the system, and if one is open, it can block certain operations, including the Q2P switch. Incomplete Transport Requests: There may be transport requests that are still in progress or not fully released, which can also lead to this error. System Configuration: The system may not be configured correctly to allow for the switch if there are dependencies on

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant