Message type: E = Error
Message class:  /SAPPCE/PNV -  
Message number: 020
Message text: Constr.progress report for WBS element &1 already exists for period &2/&3
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
The SAP error message /SAPPCE/PNV020 indicates that a construction progress report for a specific Work Breakdown Structure (WBS) element already exists for the specified period. This typically occurs in project management scenarios where progress reports are generated for WBS elements, and the system prevents duplicate entries for the same reporting period.
Cause: Duplicate Entry: The most common cause of this error is that a progress report for the specified WBS element has already been created for the given period (month/year). Incorrect Data Entry: There may be a mistake in the data entry, such as selecting the wrong WBS element or period. System Configuration: In some cases, system settings or configurations may lead to this error if they are not aligned with the reporting requirements.
Solution: Check Existing Reports: Verify if a progress report for the specified WBS element and period already exists. You can do this by navigating to the relevant transaction or report in SAP
 Get instant SAP help. Sign up for our Free Essentials Plan.
Get instant SAP help. Sign up for our Free Essentials Plan. 
/SAPPCE/PNV019 You cannot create a construction progress report for period after &1/&2
What causes this issue?  You are trying to create a construction progress report for a future period.System Response  The system issues an error messa...
/SAPPCE/PNV018 Constr.progress report for WBS element &1 and period &2/&3 already exists
What causes this issue?  A construction progress report has already been created for WBS element &V1&, fiscal year &V2& and period &am...
/SAPPCE/PNV021 Constr. progress report is not permitted; WBS element &1 has status &2
What causes this issue?  PSP Element &v1& has status &v2& (&v3&). The business transaction does not allow construction progres...
/SAPPCE/PNV022 WBS element &1 is not valid for consolidation for WBS element &2