How To Fix /SAPPCE/PNV019 - You cannot create a construction progress report for period after &1/&2


SAP Error Message - Details

  • Message type: E = Error

  • Message class: /SAPPCE/PNV -

  • Message number: 019

  • Message text: You cannot create a construction progress report for period after &1/&2

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SAPPCE/PNV019 - You cannot create a construction progress report for period after &1/&2 ?

    The SAP error message /SAPPCE/PNV019 indicates that you are trying to create a construction progress report for a period that is not allowed, specifically a period that is after the specified date (represented by &1/&2). This typically occurs in the context of project management and construction progress reporting within SAP.

    Cause:

    1. Period Restrictions: The system has defined certain restrictions on the periods for which progress reports can be generated. This is often set up to prevent reporting on future periods that have not yet occurred.
    2. Configuration Settings: The configuration settings in the project management module may restrict the reporting periods based on project timelines or fiscal year settings.
    3. Closed Periods: The period you are trying to report on may have been closed for reporting purposes, meaning that no further changes or reports can be generated for that time frame.

    Solution:

    1. Check the Reporting Period: Verify the period you are trying to report on. Ensure that it is within the allowed reporting periods as defined in your project settings.
    2. Adjust Configuration: If you have the necessary permissions, check the configuration settings in the project management module to see if the reporting periods can be adjusted to allow for future reporting.
    3. Consult with Project Manager: If you are unsure about the reporting periods, consult with your project manager or the person responsible for project configuration to understand the restrictions in place.
    4. Use Valid Period: If you need to create a report for a future period, you may need to wait until that period is open for reporting or adjust your reporting to a valid period.
    5. Check for Period Closing: Ensure that the period you are trying to report on has not been closed in the system. If it has, you may need to reopen it or adjust your reporting accordingly.

    Related Information:

    • SAP Documentation: Refer to the SAP Help Portal or your organization's SAP documentation for specific details on project reporting and period management.
    • Transaction Codes: Familiarize yourself with relevant transaction codes that may help you navigate project reporting and configuration settings, such as CJ20N for project planning or CJI3 for project reports.
    • User Roles and Permissions: Ensure that you have the appropriate user roles and permissions to create reports and access the necessary configuration settings.

    If the issue persists after checking these aspects, it may be beneficial to reach out to your SAP support team for further assistance.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant