Message type: E = Error
Message class: /SAPPCE/PNV -
Message number: 019
Message text: You cannot create a construction progress report for period after &1/&2
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
The SAP error message /SAPPCE/PNV019 indicates that you are trying to create a construction progress report for a period that is not allowed, specifically a period that is after the specified date (represented by &1/&2). This typically occurs in the context of project management and construction progress reporting within SAP.
Cause: Period Restrictions: The system has defined certain restrictions on the periods for which progress reports can be generated. This is often set up to prevent reporting on future periods that have not yet occurred. Configuration Settings: The configuration settings in the project management module may restrict the reporting periods based on project timelines or fiscal year settings. Closed Periods: The period you are trying to report on may have been closed for reporting purposes, meaning that no further changes or reports can be generated for that time frame.
Solution: Check the Reporting Period: Verify the period you are trying to report on. Ensure that it
Get instant SAP help. Sign up for our Free Essentials Plan.
/SAPPCE/PNV018
Constr.progress report for WBS element &1 and period &2/&3 already exists
What causes this issue? A construction progress report has already been created for WBS element &V1&, fiscal year &V2& and period &am...
/SAPPCE/PNV017
Cost element &1 must have negative value, since cost element category &2
What causes this issue? Cost element &V1& has a positive value. However, as this cost element is from cost element category &v2&, you...
/SAPPCE/PNV020
Constr.progress report for WBS element &1 already exists for period &2/&3
What causes this issue? You want to create or change a construction progress report for a period although progress report already exists for a subseq...
/SAPPCE/PNV021
Constr. progress report is not permitted; WBS element &1 has status &2
What causes this issue? PSP Element &v1& has status &v2& (&v3&). The business transaction does not allow construction progres...
Click on this link to search all SAP messages.