Do you have any question about this error?
Message type: E = Error
Message class: /SAPPCE/PNV -
Message number: 018
Message text: Constr.progress report for WBS element &1 and period &2/&3 already exists
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPPCE/PNV018
- Constr.progress report for WBS element &1 and period &2/&3 already exists ?The SAP error message
/SAPPCE/PNV018
indicates that a construction progress report for a specific Work Breakdown Structure (WBS) element and period already exists in the system. This typically occurs in the context of project management and construction reporting within SAP.Cause:
The error is triggered when you attempt to create or post a new construction progress report for a WBS element for a period that already has an existing report. This is a safeguard to prevent duplicate entries for the same reporting period, which could lead to inconsistencies in project tracking and reporting.
Solution:
To resolve this error, you can take the following steps:
Check Existing Reports:
- Navigate to the relevant transaction (e.g., CJI3 for project reports) and check if a progress report for the specified WBS element and period already exists.
- If it does exist, review the report to determine if it needs to be updated or if a new report is necessary.
Modify Existing Report:
- If the existing report is incorrect or needs adjustments, you may need to modify it instead of creating a new one. This could involve changing values or adding additional information.
Delete Existing Report:
- If the existing report is no longer valid and you need to create a new one, you may have the option to delete the existing report. Ensure that you have the necessary authorizations to do this and that it complies with your organization's data management policies.
Consult Documentation:
- Review any relevant documentation or guidelines provided by your organization regarding the creation and management of construction progress reports.
Contact Support:
- If you are unsure about how to proceed or if the issue persists, consider reaching out to your SAP support team or a functional consultant who specializes in project management within SAP.
Related Information:
By following these steps, you should be able to resolve the error and manage your construction progress reports effectively.
Get instant SAP help. Start your 7-day free trial now.
/SAPPCE/PNV017
Cost element &1 must have negative value, since cost element category &2
What causes this issue? Cost element &V1& has a positive value. However, as this cost element is from cost element category &v2&, you...
/SAPPCE/PNV016
Cost element &1 must have positive value, since cost element category &2
What causes this issue? The cost element &V1& has a negative value. As this cost element is from cost element category &V2&, you must...
/SAPPCE/PNV019
You cannot create a construction progress report for period after &1/&2
What causes this issue? You are trying to create a construction progress report for a future period.System Response The system issues an error messa...
/SAPPCE/PNV020
Constr.progress report for WBS element &1 already exists for period &2/&3
What causes this issue? You want to create or change a construction progress report for a period although progress report already exists for a subseq...
Click on this link to search all SAP messages.