Do you have any question about this error?
Message type: E = Error
Message class: /SAPPCE/PNV -
Message number: 021
Message text: Constr. progress report is not permitted; WBS element &1 has status &2
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPPCE/PNV021
- Constr. progress report is not permitted; WBS element &1 has status &2 ?The SAP error message
/SAPPCE/PNV021
indicates that a construction progress report cannot be generated for a specific Work Breakdown Structure (WBS) element because it has a status that does not permit such reporting. The message typically includes the WBS element number (&1
) and its current status (&2
).Cause:
The error is caused by the WBS element being in a status that restricts progress reporting. Common statuses that may prevent progress reporting include:
To resolve this error, you can take the following steps:
Check the Status of the WBS Element:
CJ03
(Display Project) or CJ20N
(Project Builder) to view the status of the WBS element.Change the Status:
CJ02
(Change Project) or through the Project Builder.Consult with Project Management:
Review Configuration Settings:
Documentation and Training:
CJ01
(Create Project), CJ02
(Change Project), CJ03
(Display Project), and CJ20N
(Project Builder).By following these steps, you should be able to resolve the error and proceed with the construction progress reporting as needed.
Get instant SAP help. Start your 7-day free trial now.
/SAPPCE/PNV020
Constr.progress report for WBS element &1 already exists for period &2/&3
What causes this issue? You want to create or change a construction progress report for a period although progress report already exists for a subseq...
/SAPPCE/PNV019
You cannot create a construction progress report for period after &1/&2
What causes this issue? You are trying to create a construction progress report for a future period.System Response The system issues an error messa...
/SAPPCE/PNV022
WBS element &1 is not valid for consolidation for WBS element &2
What causes this issue? For WBS element &V2&, the system cannot update the value of the construction progress report to WBS element &V1&a...
/SAPPCE/PNV023
WBS element valid for consolidation is needed for WBS element &1
What causes this issue? The system cannot update the value of the construction progress report for WBS element &V1& for a higher-level WBS el...
Click on this link to search all SAP messages.