Do you have any question about this error?
Stop googling SAP errors. Use our Free Essentials plan instead - no credit card needed. Start Now →
Message type: E = Error
Message class: /SAPAPO/SNP -
Message number: 432
Message text: Cal. from planning cal. &1 for shipment at loc. &2 is diffnt from res. &3
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/SNP432
- Cal. from planning cal. &1 for shipment at loc. &2 is diffnt from res. &3 ?The SAP error message
/SAPAPO/SNP432
typically occurs in the context of Advanced Planning and Optimization (APO) when there is a discrepancy between the planning calendar used for a shipment and the resource calendar associated with the resource being utilized. This can lead to issues in scheduling and resource allocation.Cause:
The error message indicates that the planning calendar for the shipment (identified by location &2) is different from the resource calendar (identified by resource &3). This discrepancy can arise due to several reasons:
- Different Calendars: The shipment is scheduled using a different planning calendar than the one assigned to the resource.
- Configuration Issues: There may be configuration issues in the APO system where the calendars are not aligned properly.
- Master Data Issues: The master data for either the shipment or the resource may not be set up correctly, leading to mismatched calendars.
Solution:
To resolve this error, you can take the following steps:
Check Planning Calendar Settings:
- Verify the planning calendar assigned to the shipment. Ensure that it is the correct one for the location in question.
- Check the resource calendar assigned to the resource. Make sure it is set up correctly and matches the intended planning calendar.
Align Calendars:
- If the shipment and resource are using different calendars, consider aligning them. You may need to change the planning calendar for the shipment or adjust the resource calendar to ensure they match.
Review Master Data:
- Check the master data for both the shipment and the resource. Ensure that all relevant settings, including calendars, are correctly configured.
Consult Documentation:
- Refer to SAP documentation or help resources for more detailed information on configuring planning and resource calendars.
Testing:
- After making changes, test the planning process again to ensure that the error does not reoccur.
Related Information:
/SAPAPO/SDP94
(for planning board) or /SAPAPO/MC90
(for resource planning) to check and modify the relevant settings.By following these steps, you should be able to identify and resolve the cause of the /SAPAPO/SNP432
error message.
Get instant SAP help. Sign up for our Free Essentials Plan.
/SAPAPO/SNP431
Cal. from planning cal. &1 for production at loc. &2 is diff. frm res. &3
What causes this issue? The calendar from the planning calendar (timestream) &V1& that you specified for production at location &V2&,...
/SAPAPO/SNP430
Planning calendar (time stream) &1 is not set to UTC timezone
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/SNP433
Cal. from planning cal. &1 for warehouse at loc. &2 is diffnt frm res. &3
What causes this issue? The calendar from the planning calendar (timestream) &V1& that you specified for the warehouse at location &V2&am...
/SAPAPO/SNP434
Planning calendar &1 in periods is not always 00:00:00-24:00:00
What causes this issue? The periods that you generated for the planning calendar (timestream) &V1&, have not always been set from 00:00:00-24...
Click on this link to search all SAP messages.