Message type: E = Error
Message class: /SAPAPO/SNP -
Message number: 433
Message text: Cal. from planning cal. &1 for warehouse at loc. &2 is diffnt frm res. &3
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/SNP433
- Cal. from planning cal. &1 for warehouse at loc. &2 is diffnt frm res. &3 ?The SAP error message
/SAPAPO/SNP433
typically occurs in the context of Advanced Planning and Optimization (APO) when there is a discrepancy between the planning calendar used for a specific warehouse location and the resource calendar associated with that resource. This can lead to issues in planning and scheduling, as the system expects consistency between the calendars.Cause:
The error message indicates that the planning calendar assigned to the warehouse location (
&2
) is different from the calendar assigned to the resource (&3
). This inconsistency can arise due to:
- Different Calendar Assignments: The warehouse and the resource may have been assigned different planning calendars, leading to mismatches in available working days or hours.
- Configuration Issues: There may be a misconfiguration in the master data settings for either the warehouse or the resource.
- Changes in Master Data: Recent changes to the planning calendars or resource settings may not have been properly synchronized.
Solution:
To resolve this error, you can take the following steps:
Check Calendar Assignments:
- Go to the master data settings for both the warehouse and the resource.
- Verify the planning calendar assigned to the warehouse location and the resource. Ensure they are the same.
Update Calendar Settings:
- If the calendars are different, you may need to update one of them to ensure they match. This can be done in the relevant master data transaction (e.g., using transaction codes like
/SAPAPO/RES01
for resources or/SAPAPO/LOC1
for locations).Consistency Check:
- After making changes, perform a consistency check to ensure that all related data is aligned. This can help identify any other discrepancies that may exist.
Re-run Planning:
- Once the calendars are aligned, re-run the planning process to see if the error persists.
Consult Documentation:
- If the issue continues, consult SAP documentation or support for further troubleshooting steps specific to your version and configuration of SAP APO.
Related Information:
/SAPAPO/RES01
for resources and /SAPAPO/LOC1
for locations.By following these steps, you should be able to resolve the /SAPAPO/SNP433
error and ensure that your planning processes run smoothly.
Get instant SAP help. Start your 7-day free trial now.
/SAPAPO/SNP432
Cal. from planning cal. &1 for shipment at loc. &2 is diffnt from res. &3
What causes this issue? The calendar from the planning calendar (timestream) &V1& that you specified for shipment at location &V2&, i...
/SAPAPO/SNP431
Cal. from planning cal. &1 for production at loc. &2 is diff. frm res. &3
What causes this issue? The calendar from the planning calendar (timestream) &V1& that you specified for production at location &V2&,...
/SAPAPO/SNP434
Planning calendar &1 in periods is not always 00:00:00-24:00:00
What causes this issue? The periods that you generated for the planning calendar (timestream) &V1&, have not always been set from 00:00:00-24...
/SAPAPO/SNP435
Order quantity &1 < fixed lot size &2 for product &3
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.