Do you have any question about this error?
Message type: E = Error
Message class: /SAPAPO/SNP -
Message number: 430
Message text: Planning calendar (time stream) &1 is not set to UTC timezone
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/SNP430
- Planning calendar (time stream) &1 is not set to UTC timezone ?The SAP error message
/SAPAPO/SNP430 Planning calendar (time stream) &1 is not set to UTC timezone
typically occurs in the context of SAP Advanced Planning and Optimization (APO) when there is a mismatch in the time zone settings for the planning calendar. This can lead to issues with scheduling and time-related calculations in the system.Cause:
- Time Zone Configuration: The planning calendar (time stream) is not configured to use the UTC (Coordinated Universal Time) timezone. This can happen if the calendar was created or modified without setting the correct timezone.
- System Settings: The system may have default settings that do not align with the required UTC timezone for the planning calendar.
- Data Migration or Changes: If there have been recent changes or migrations in the system, the timezone settings may not have been updated accordingly.
Solution:
To resolve this error, you can follow these steps:
Check Planning Calendar Settings:
- Go to the transaction code
/SAPAPO/TS
(or the relevant transaction for managing time streams).- Locate the planning calendar (time stream) indicated in the error message.
- Verify the timezone settings for the calendar. Ensure that it is set to UTC.
Modify Time Stream:
- If the timezone is not set to UTC, you will need to modify the time stream settings.
- Change the timezone to UTC and save the changes.
Review System Time Zone Settings:
- Check the overall system settings for time zones. Ensure that the system is configured to use UTC where necessary.
- You can check the system time zone settings in transaction
RZ10
orRZ11
.Testing:
- After making the changes, test the planning calendar functionality to ensure that the error no longer occurs.
Consult Documentation:
- If you are unsure about making these changes, consult the SAP documentation or reach out to your SAP Basis or APO consultant for assistance.
Related Information:
By ensuring that the planning calendar is set to the UTC timezone, you should be able to resolve the error and ensure proper functionality within the SAP APO system.
Get instant SAP help. Start your 7-day free trial now.
/SAPAPO/SNP429
Horizon for planning calendar &1 at location &2 is not 00:00:00-24:00:00
What causes this issue? The planning calendar (timestream) &V1& that you specified at location &V2&, has not been set as 00:00:00-24:...
/SAPAPO/SNP428
The timezone at location &1 is not set to UTC timezone
What causes this issue? The timezone that you have set at location &V1&, is not UTC. However, this timezone is mandatory for capacity levelin...
/SAPAPO/SNP431
Cal. from planning cal. &1 for production at loc. &2 is diff. frm res. &3
What causes this issue? The calendar from the planning calendar (timestream) &V1& that you specified for production at location &V2&,...
/SAPAPO/SNP432
Cal. from planning cal. &1 for shipment at loc. &2 is diffnt from res. &3
What causes this issue? The calendar from the planning calendar (timestream) &V1& that you specified for shipment at location &V2&, i...
Click on this link to search all SAP messages.