Do you have any question about this error?
Message type: E = Error
Message class: /SAPAPO/SNP -
Message number: 429
Message text: Horizon for planning calendar &1 at location &2 is not 00:00:00-24:00:00
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/SNP429
- Horizon for planning calendar &1 at location &2 is not 00:00:00-24:00:00 ?The SAP error message
/SAPAPO/SNP429
indicates an issue with the planning horizon for a specific location in the SAP Advanced Planning and Optimization (APO) module. The error message states that the planning calendar for the specified location does not cover the full 24-hour period (00:00:00 to 24:00:00). This can lead to problems in planning processes, as the system expects a complete time frame for effective planning.Cause:
- Incorrect Planning Calendar Configuration: The planning calendar for the location may not be set up to cover the entire day, which is required for certain planning processes.
- Time Zone Issues: There may be discrepancies in time zone settings that affect how the planning horizon is interpreted.
- Master Data Issues: The master data for the location may not be correctly defined, leading to incomplete time frames.
Solution:
To resolve this error, you can take the following steps:
Check Planning Calendar:
- Go to the transaction code
/SAPAPO/MC62
(or the relevant transaction for maintaining planning calendars).- Verify the planning calendar assigned to the location and ensure that it covers the full time range from 00:00:00 to 24:00:00.
Adjust Planning Horizon:
- If the planning calendar is incorrect, you may need to create or modify the planning calendar to ensure it spans the entire day.
- Ensure that the planning horizon settings in the location's master data are correctly defined.
Review Location Master Data:
- Check the location master data in transaction
/SAPAPO/LOC1
or the relevant transaction for maintaining location data.- Ensure that the planning horizon and calendar settings are correctly configured.
Consult Documentation:
- Review SAP documentation or help resources for specific details on configuring planning calendars and horizons.
Testing:
- After making the necessary adjustments, test the planning process again to ensure that the error is resolved.
Related Information:
/SAPAPO/MC62
: Maintain Planning Calendar/SAPAPO/LOC1
: Maintain Location Master DataBy following these steps, you should be able to resolve the error and ensure that the planning horizon is correctly set for the specified location.
Get instant SAP help. Start your 7-day free trial now.
/SAPAPO/SNP428
The timezone at location &1 is not set to UTC timezone
What causes this issue? The timezone that you have set at location &V1&, is not UTC. However, this timezone is mandatory for capacity levelin...
/SAPAPO/SNP427
Inconsistencies in the orders for period &1
What causes this issue? The orders in period &V1& are inconsistent. This could be because time zone UTC is not being used exclusively.System ...
/SAPAPO/SNP430
Planning calendar (time stream) &1 is not set to UTC timezone
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/SNP431
Cal. from planning cal. &1 for production at loc. &2 is diff. frm res. &3
What causes this issue? The calendar from the planning calendar (timestream) &V1& that you specified for production at location &V2&,...
Click on this link to search all SAP messages.