How To Fix /SAPAPO/RRP_PT260 - Availabile capacity for the resource could not be changed


SAP Error Message - Details

  • Message type: E = Error

  • Message class: /SAPAPO/RRP_PT -

  • Message number: 260

  • Message text: Availabile capacity for the resource could not be changed

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SAPAPO/RRP_PT260 - Availabile capacity for the resource could not be changed ?

    The SAP error message /SAPAPO/RRP_PT260 indicates that there is an issue with changing the available capacity for a resource in the Advanced Planning and Optimization (APO) module. This error can arise due to various reasons, and understanding the cause is essential for finding a solution.

    Causes of the Error

    1. Resource Locking: The resource may be locked by another user or process, preventing changes to its capacity.
    2. Incorrect Configuration: The resource may not be configured correctly in the system, leading to issues when attempting to change its capacity.
    3. Capacity Planning Settings: The settings for capacity planning may not allow for changes to be made at the time you are trying to make them.
    4. Authorization Issues: The user may not have the necessary authorizations to change the capacity of the resource.
    5. Data Consistency Issues: There may be inconsistencies in the data related to the resource, such as overlapping capacity periods or incorrect data entries.
    6. Time Period Restrictions: The time period for which you are trying to change the capacity may be closed or restricted.

    Solutions

    1. Check Resource Locking: Verify if the resource is locked by another user or process. If it is, wait for the lock to be released or contact the user who has locked it.

    2. Review Resource Configuration: Ensure that the resource is correctly configured in the system. Check the resource master data for any inconsistencies or missing information.

    3. Adjust Capacity Planning Settings: Review the capacity planning settings to ensure that they allow for changes. This may involve checking the planning version or the planning horizon.

    4. Verify Authorizations: Ensure that the user attempting to make the change has the necessary authorizations. This may require checking user roles and permissions in the system.

    5. Check Data Consistency: Look for any inconsistencies in the data related to the resource. This may involve checking for overlapping capacity periods or correcting any erroneous data entries.

    6. Review Time Period Restrictions: Ensure that the time period you are trying to change is open for modifications. If it is closed, you may need to open it or adjust your changes to a valid time period.

    Related Information

    • Transaction Codes: You may need to use transaction codes like /SAPAPO/RRP3 (Resource Planning) or /SAPAPO/RES01 (Resource Overview) to check the resource details and capacity.
    • SAP Notes: Check for any relevant SAP Notes that may address this specific error or provide additional troubleshooting steps.
    • Documentation: Refer to the SAP APO documentation for detailed information on resource management and capacity planning.

    If the issue persists after trying the above solutions, it may be beneficial to consult with your SAP Basis or APO support team for further assistance.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker