Do you have any question about this error?
Message type: E = Error
Message class: /SAPAPO/RRP_PT -
Message number: 261
Message text: Save your data in order to change the available capacity
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/RRP_PT261
- Save your data in order to change the available capacity ?The SAP error message
/SAPAPO/RRP_PT261
typically indicates that there is an issue with saving data related to capacity changes in the Advanced Planning and Optimization (APO) module. This error often arises when there are unsaved changes in the planning book or when the system is unable to update the available capacity due to certain constraints.Cause:
- Unsaved Changes: The user may have made changes in the planning book that have not been saved, which prevents the system from updating the available capacity.
- Locking Issues: Another user or process may have locked the data that you are trying to change, preventing you from saving your changes.
- Data Consistency: There may be inconsistencies in the data that need to be resolved before the system can allow changes to the available capacity.
- Authorization Issues: The user may not have the necessary authorizations to make changes to the capacity data.
Solution:
- Save Your Changes: Ensure that you save any changes you have made in the planning book before attempting to change the available capacity.
- Check for Locks: Verify if the data you are trying to change is locked by another user or process. You can use transaction codes like
SM12
to check for locks andSM21
for system logs.- Data Consistency Check: Run consistency checks to ensure that there are no issues with the data. This can often be done through specific reports or transactions in APO.
- Review Authorizations: Check if you have the necessary authorizations to make changes to the capacity. If not, contact your system administrator to obtain the required permissions.
- Consult Documentation: Refer to SAP documentation or notes related to this error message for any specific guidance or patches that may be applicable.
Related Information:
/SAPAPO/RRP
for planning and /SAPAPO/SDP
for supply network planning.If the problem persists after trying the above solutions, it may be beneficial to reach out to your SAP support team for further assistance.
Get instant SAP help. Start your 7-day free trial now.
/SAPAPO/RRP_PT260
Availabile capacity for the resource could not be changed
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/RRP_PT255
You selected &1 resources; only one is allowed
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/RRP_PT262
Resource &1: Error in capacity calulation in time period &2 - &3
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/RRP_PT263
Overflow when calculating the resource utilization for resource &1
What causes this issue? During aggregation of the resource utilization for resource &V1&, the maximum capacity of the resource has been excee...
Click on this link to search all SAP messages.