Do you have any question about this error?
Message type: E = Error
Message class: /SAPAPO/RRP_PT -
Message number: 262
Message text: Resource &1: Error in capacity calulation in time period &2 - &3
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/RRP_PT262
- Resource &1: Error in capacity calulation in time period &2 - &3 ?The SAP error message
/SAPAPO/RRP_PT262 Resource &1: Error in capacity calculation in time period &2 - &3
typically occurs in the context of Advanced Planning and Optimization (APO) when there is an issue with the capacity calculation for a specific resource during a defined time period. Here’s a breakdown of the potential causes, solutions, and related information for this error:Causes:
Resource Configuration Issues: The resource may not be properly configured in the system. This includes missing or incorrect settings for capacity, availability, or other parameters.
Capacity Constraints: There may be constraints or limits set on the resource that are being violated during the calculation period.
Data Inconsistencies: Inconsistencies in master data (like resource master data, production versions, or planning data) can lead to errors during capacity calculations.
Time Period Issues: The specified time period may not be valid or may not have any relevant data for the resource in question.
Planning Version Issues: The planning version being used may not be correctly set up or may not have the necessary data.
Locking Issues: If the resource is locked by another process or user, it may lead to errors in capacity calculations.
Solutions:
Check Resource Configuration: Review the configuration of the resource in the system. Ensure that all necessary parameters (like capacity, availability, and shifts) are correctly set.
Review Capacity Constraints: Check if there are any capacity constraints that are being violated. Adjust the constraints if necessary.
Validate Master Data: Ensure that all relevant master data is consistent and correctly maintained. This includes checking the resource master, production versions, and any related planning data.
Examine Time Period: Verify that the time period specified in the error message is valid and that there is relevant data for that period.
Check Planning Version: Ensure that the planning version being used is correctly set up and contains the necessary data for the resource.
Unlock Resource: If the resource is locked, identify the process or user that is holding the lock and resolve the issue.
Run Consistency Checks: Use SAP tools to run consistency checks on the planning data to identify and resolve any discrepancies.
Related Information:
Transaction Codes: You may want to use transaction codes like /SAPAPO/RRP3
(Resource Planning) or /SAPAPO/SDP94
(Supply Network Planning) to analyze the resource and its capacity.
SAP Notes: Check for any relevant SAP Notes that may address known issues related to this error message.
Documentation: Refer to SAP documentation for Advanced Planning and Optimization for detailed information on resource planning and capacity calculations.
Support: If the issue persists after checking the above points, consider reaching out to SAP support for further assistance.
By following these steps, you should be able to identify and resolve the issue causing the error message in your SAP APO system.
Get instant SAP help. Start your 7-day free trial now.
/SAPAPO/RRP_PT261
Save your data in order to change the available capacity
What causes this issue? You changed the available capacity of a resource.System Response The system issues an error message and will not allow you t...
/SAPAPO/RRP_PT260
Availabile capacity for the resource could not be changed
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/RRP_PT263
Overflow when calculating the resource utilization for resource &1
What causes this issue? During aggregation of the resource utilization for resource &V1&, the maximum capacity of the resource has been excee...
/SAPAPO/RRP_PT300
**** Comment **** Messages for Periods
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.