How To Fix /SAPAPO/RRP_PT254 - No capacity requirements can be determined on resource; return code: &1


SAP Error Message - Details

  • Message type: E = Error

  • Message class: /SAPAPO/RRP_PT -

  • Message number: 254

  • Message text: No capacity requirements can be determined on resource; return code: &1

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SAPAPO/RRP_PT254 - No capacity requirements can be determined on resource; return code: &1 ?

    The SAP error message /SAPAPO/RRP_PT254 No capacity requirements can be determined on resource; return code: &1 typically occurs in the context of Advanced Planning and Optimization (APO) when the system is unable to determine capacity requirements for a specific resource during planning activities. This can happen for various reasons, and understanding the cause is crucial for resolving the issue.

    Causes:

    1. Resource Configuration Issues: The resource may not be properly configured in the system. This includes missing or incorrect settings in the resource master data.

    2. Planning Version: The planning version being used may not have the necessary data or may not be active.

    3. Capacity Planning Settings: The settings for capacity planning might not be correctly defined, such as the capacity category or the planning strategy.

    4. No Demand or Supply: There may be no demand or supply for the resource in the planning horizon, leading to no capacity requirements being generated.

    5. Resource Availability: The resource may be set as unavailable or may have been blocked for planning.

    6. Incorrect Time Period: The planning run may be set for a time period where no capacity requirements exist.

    Solutions:

    1. Check Resource Configuration: Verify the resource master data to ensure that all necessary fields are filled out correctly. Check the capacity settings, availability, and any relevant parameters.

    2. Review Planning Version: Ensure that the correct planning version is being used and that it is active. Check if the version has the necessary data for the resource.

    3. Adjust Capacity Planning Settings: Review the capacity planning settings for the resource. Ensure that the capacity category and planning strategy are correctly defined.

    4. Analyze Demand and Supply: Check if there is any demand or supply for the resource in the planning horizon. If there is none, consider adjusting the planning parameters or extending the planning horizon.

    5. Resource Availability Check: Ensure that the resource is available for planning and not blocked or set to unavailable.

    6. Check Time Period: Verify that the planning run is set for a time period where capacity requirements should exist.

    Related Information:

    • Transaction Codes: You may need to use transaction codes like /SAPAPO/RRP3 (Product View) or /SAPAPO/RRP4 (Resource View) to analyze the resource and its capacity requirements.

    • SAP Notes: Check for any relevant SAP Notes that may address specific issues related to this error message.

    • Documentation: Refer to SAP documentation for Advanced Planning and Optimization for detailed information on resource planning and capacity management.

    • Debugging: If the issue persists, consider debugging the planning run to identify where the capacity requirements are not being generated.

    By following these steps, you should be able to identify the cause of the error and implement a solution to resolve it.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant