Do you have any question about this error?
Message type: E = Error
Message class: /SAPAPO/RRP_CDOC -
Message number: 048
Message text: Selected operation lies partially or completely in the past
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/RRP_CDOC048
- Selected operation lies partially or completely in the past ?The SAP error message
/SAPAPO/RRP_CDOC048
indicates that a selected operation in the Advanced Planning and Optimization (APO) module lies partially or completely in the past. This typically occurs when you are trying to plan or execute operations that are scheduled for a time that has already passed, which is not allowed in the planning process.Cause:
- Past Dates: The operation you are trying to work with has a start or end date that is earlier than the current date.
- Incorrect Planning Horizon: The planning horizon set in the system may not be aligned with the current date, leading to operations being scheduled in the past.
- Data Entry Errors: There may be incorrect data entries in the planning or scheduling that result in operations being assigned to past dates.
- Changes in Demand or Supply: Changes in demand or supply that were not accounted for may have pushed the operation's schedule into the past.
Solution:
- Check Dates: Review the dates of the operation you are trying to process. Ensure that they are set to a future date.
- Adjust Planning Horizon: If the planning horizon is too short, consider extending it to include the necessary time frame for operations.
- Re-schedule Operations: If operations are incorrectly scheduled, you may need to re-schedule them to future dates based on current demand and supply conditions.
- Review Master Data: Check the master data for the materials and resources involved to ensure that there are no discrepancies that could lead to scheduling issues.
- Use Planning Tools: Utilize the planning tools available in SAP APO to analyze and adjust the planning scenarios. This may include using the Heuristic or Optimization tools to generate a feasible plan.
- Consult Logs and Messages: Review any logs or additional error messages that may provide more context on why the operation is being scheduled in the past.
Related Information:
/SAPAPO/RRP3
for the interactive planning board, which can help visualize and adjust operations.By following these steps, you should be able to resolve the error and ensure that your operations are scheduled correctly in the future.
Get instant SAP help. Start your 7-day free trial now.
/SAPAPO/RRP_CDOC047
No available capacity between current and previous operation
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/RRP_CDOC046
No available capacity between current and following operation
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/RRP_CDOC049
Heuristic &1 cannot be executed
What causes this issue? The heuristic <LS>Capacity-Driven Order Creation</> cannot be called from this transaction at this point.System R...
/SAPAPO/RRP_CDOC050
Assembly scrap and operation scrap maintained
What causes this issue? You have specified both the assembly scrap in the product master and the operation scrap in the source of supply. This is not...