How To Fix /SAPAPO/RRP_CDOC046 - No available capacity between current and following operation


SAP Error Message - Details

  • Message type: E = Error

  • Message class: /SAPAPO/RRP_CDOC -

  • Message number: 046

  • Message text: No available capacity between current and following operation

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SAPAPO/RRP_CDOC046 - No available capacity between current and following operation ?

    The SAP error message /SAPAPO/RRP_CDOC046 indicates that there is no available capacity between the current operation and the following operation in the production planning process. This error typically arises in the context of Advanced Planning and Optimization (APO) when scheduling production orders or during the capacity planning phase.

    Cause:

    1. Capacity Constraints: The most common cause is that the available capacity of the work center or resource is insufficient to handle the workload required for the subsequent operation.
    2. Scheduling Conflicts: There may be overlapping operations or scheduled maintenance that reduces the available capacity.
    3. Incorrect Master Data: Issues with master data, such as incorrect capacity settings for work centers, can lead to this error.
    4. Production Order Settings: The settings in the production order may not align with the available capacity, such as start and end times or operation sequences.
    5. Resource Allocation: If resources are allocated to other tasks or orders, it can lead to a lack of capacity for the current operation.

    Solution:

    1. Check Capacity Availability: Review the capacity of the work center or resource to ensure that it can accommodate the required workload. You can do this through transaction codes like CM01 (Capacity Planning) or CM21 (Capacity Leveling).
    2. Adjust Scheduling: If there are scheduling conflicts, consider rescheduling operations or adjusting the production order to allow for sufficient capacity.
    3. Review Master Data: Ensure that the master data for work centers, including available capacity, shift patterns, and resource allocation, is correctly maintained.
    4. Modify Production Order: If necessary, modify the production order to change the sequence of operations or adjust the timing to fit within the available capacity.
    5. Capacity Planning: Use capacity planning tools in SAP APO to analyze and optimize resource allocation and scheduling.
    6. Consult with Production Planners: Collaborate with production planners to understand the constraints and find a feasible solution.

    Related Information:

    • Transaction Codes: Familiarize yourself with relevant transaction codes such as CM01, CM21, MD04 (Stock/Requirements List), and COHV (Mass Processing of Production Orders).
    • Capacity Planning in APO: Understanding the principles of capacity planning in SAP APO can help in troubleshooting and resolving capacity-related issues.
    • Documentation: Refer to SAP Help documentation for detailed information on capacity planning and production scheduling.
    • User Exits and BAdIs: In some cases, custom logic implemented through user exits or Business Add-Ins (BAdIs) may affect capacity calculations.

    By following these steps and understanding the underlying causes, you can effectively address the /SAPAPO/RRP_CDOC046 error and ensure smooth production planning and scheduling in SAP.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker