Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/RRP_CDOC047
- No available capacity between current and previous operation ?The SAP error message
/SAPAPO/RRP_CDOC047
indicates that there is no available capacity between the current and previous operation in the production planning process. This error typically arises in the context of Advanced Planning and Optimization (APO) when trying to schedule operations in a production order or when performing capacity planning.Cause:
- Capacity Constraints: The most common cause is that the capacity of the work center or resource is insufficient to handle the load required by the operations scheduled.
- Scheduling Conflicts: There may be overlapping operations or scheduling conflicts that prevent the system from allocating the necessary capacity.
- Incorrect Setup: The configuration of the work center, including available capacity, shift definitions, or resource allocation, may not be set up correctly.
- Lead Times: The lead times defined for operations may not allow for sufficient time between operations, leading to capacity issues.
- Production Order Settings: The settings in the production order may not align with the available capacity, such as incorrect operation sequences or durations.
Solution:
- Check Capacity Availability: Review the capacity of the work center or resource to ensure it can accommodate the operations scheduled. You can do this through transaction codes like
CM01
(Capacity Planning) orCM21
(Capacity Leveling).- Adjust Scheduling: Modify the scheduling of operations to ensure that there is enough time and capacity between them. This may involve changing the start and end times of operations or adjusting the sequence.
- Review Work Center Configuration: Ensure that the work center is configured correctly, including the available capacity, shift definitions, and any relevant parameters.
- Modify Lead Times: If lead times are too tight, consider adjusting them to allow for more flexibility in scheduling.
- Check Production Order: Review the production order for any inconsistencies or errors in the operation sequences, durations, or dependencies.
- Capacity Planning: Use capacity planning tools within SAP APO to analyze and optimize the capacity utilization.
Related Information:
CM01
, CM21
, COHV
, and C223
for capacity planning and production order management.By following these steps, you should be able to identify the root cause of the error and implement a solution to resolve it.
Get instant SAP help. Start your 7-day free trial now.
/SAPAPO/RRP_CDOC046
No available capacity between current and following operation
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/RRP_CDOC045
Multiple sources of supply are possible
What causes this issue? In the settings for the heuristic you have selected the indicator <LS>Do Not Display Dialog Box</>. Because a num...
/SAPAPO/RRP_CDOC048
Selected operation lies partially or completely in the past
What causes this issue? The selected operation lies completely in the past and the setting <LS>Scheduling to the Past Allowed</> has <...
/SAPAPO/RRP_CDOC049
Heuristic &1 cannot be executed
What causes this issue? The heuristic <LS>Capacity-Driven Order Creation</> cannot be called from this transaction at this point.System R...
Click on this link to search all SAP messages.