Do you have any question about this error?
Message type: E = Error
Message class: /SAPAPO/RRP_CDOC -
Message number: 050
Message text: Assembly scrap and operation scrap maintained
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/RRP_CDOC050
- Assembly scrap and operation scrap maintained ?The SAP error message
/SAPAPO/RRP_CDOC050
typically indicates that there is a conflict in the configuration of assembly scrap and operation scrap in the context of production planning and control within the SAP Advanced Planning and Optimization (APO) module. This error arises when both assembly scrap and operation scrap are maintained for a product, which can lead to inconsistencies in planning and execution.Cause:
- Configuration Conflict: The error is triggered when both assembly scrap and operation scrap are defined for a product in the system. This can happen if the product master data or the production process is incorrectly set up.
- Data Inconsistency: There may be inconsistencies in the data maintained in the product master or in the production planning settings that lead to this error.
Solution:
To resolve the error, you can follow these steps:
Review Product Master Data:
- Go to the product master data in SAP APO and check the settings for the specific product that is causing the error.
- Ensure that either assembly scrap or operation scrap is maintained, but not both. You may need to decide which one is appropriate for your production process.
Adjust Scrap Settings:
- If you determine that assembly scrap is necessary, remove or adjust the operation scrap settings accordingly, or vice versa.
- This can typically be done in the product master under the "Production" or "Planning" views.
Check Production Process:
- Review the production process and ensure that the scrap settings align with the actual manufacturing process.
- If necessary, consult with production planners or engineers to understand the implications of changing scrap settings.
Test Changes:
- After making adjustments, test the changes in a development or quality environment to ensure that the error is resolved and that the production planning process works as expected.
Documentation and Training:
- Document the changes made and provide training to relevant personnel to prevent similar issues in the future.
Related Information:
/SAPAPO/RRP3
(Product View) or /SAPAPO/RRP4
(Planning Table) to analyze and adjust planning data.By following these steps, you should be able to resolve the /SAPAPO/RRP_CDOC050
error and ensure that your production planning processes run smoothly.
Get instant SAP help. Start your 7-day free trial now.
/SAPAPO/RRP_CDOC049
Heuristic &1 cannot be executed
What causes this issue? The heuristic <LS>Capacity-Driven Order Creation</> cannot be called from this transaction at this point.System R...
/SAPAPO/RRP_CDOC048
Selected operation lies partially or completely in the past
What causes this issue? The selected operation lies completely in the past and the setting <LS>Scheduling to the Past Allowed</> has <...
/SAPAPO/RRP_CDOC051
Start or end date outside planning period
What causes this issue? Either the specified start or end date lies outside the planning period or you have specified a start or end date. You may ha...
/SAPAPO/RRP_CDOC052
There is an overload in the area of the operation that is to be extended
What causes this issue? You are trying to extend an operation backward or forward. However, in the area of the operation that you want to extend, the...
Click on this link to search all SAP messages.