How To Fix /SAPAPO/RRP_CDOC051 - Start or end date outside planning period


/SAPAPO/RRP_CDOC051 - Overview

  • Message type: E = Error

  • Message class: /SAPAPO/RRP_CDOC -

  • Message number: 051

  • Message text: Start or end date outside planning period

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SAPAPO/RRP_CDOC051 - Start or end date outside planning period ?
    The SAP error message /SAPAPO/RRP_CDOC051 indicates that the start or end date of a planning object (such as a production order, purchase order, or any other planning-related document) falls outside the defined planning period in the Advanced Planning and Optimization (APO) module. This can occur in various scenarios, such as when trying to create or modify a planning document that has dates not aligned with the planning horizon set in the system.
    
    Cause: Planning Period Configuration: The planning period may not be set correctly in the APO system. This could be due to changes in the planning calendar or settings that have not been updated. Document Dates: The dates specified in the planning document (start or end dates) are outside the range defined by the planning period. Master Data Issues: The master data (like product, location, etc.) may have incorrect or outdated information that does not align with the current planning period. Time Series Data:

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author