How To Fix /SAPAPO/RRP_CDOC053 - Deallocated operations cannot be extended


/SAPAPO/RRP_CDOC053 - Overview

  • Message type: E = Error

  • Message class: /SAPAPO/RRP_CDOC -

  • Message number: 053

  • Message text: Deallocated operations cannot be extended

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SAPAPO/RRP_CDOC053 - Deallocated operations cannot be extended ?
    The SAP error message /SAPAPO/RRP_CDOC053 indicates that there are deallocated operations in a production or planning order that cannot be extended. This typically occurs in the context of Advanced Planning and Optimization (APO) within SAP, particularly when dealing with production planning and scheduling.
    
    Cause: Deallocated Operations: The error arises when there are operations in a production order that have been deallocated, meaning they are no longer assigned to a specific resource or have been removed from the planning process. Resource Constraints: The system may not allow the extension of operations that are not currently allocated to resources, as this could lead to inconsistencies in planning. Order Status: The status of the order may not permit changes or extensions due to its current state (e.g., completed, closed, etc.). Planning Parameters: Certain planning parameters or settings may restrict the ability to extend operations that have been deallocated.
    Solution: Check Order Status: Verify the status of the production order. If

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker