How To Fix /SAPAPO/RELEASE010 - Scheduling agreement release not confirmed


/SAPAPO/RELEASE010 - Overview

  • Message type: E = Error

  • Message class: /SAPAPO/RELEASE -

  • Message number: 010

  • Message text: Scheduling agreement release not confirmed

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SAPAPO/RELEASE010 - Scheduling agreement release not confirmed ?
    The SAP error message /SAPAPO/RELEASE010 indicates that a scheduling agreement release could not be confirmed in the Advanced Planning and Optimization (APO) module. This error typically arises in the context of supply chain management, where scheduling agreements are used to manage the procurement of materials.
    Causes:
    
    Data Inconsistency: There may be inconsistencies in the data related to the scheduling agreement, such as missing or incorrect information in the master data (e.g., material master, vendor master).
    Release Strategy Issues: The release strategy defined for the scheduling agreement may not be met, leading to the inability to confirm the release.
    Capacity Constraints: There may be capacity constraints in production or procurement that prevent the scheduling agreement from being confirmed.
    System Configuration: Incorrect configuration settings in the APO system or integration issues with the ERP system can lead to this error.
    Authorization Issues: The user may not have the necessary authorizations to confirm the scheduling agreement release.
    
    Solutions:
    
    Check Data Consistency:

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant