Do you have any question about this error?
Message type: E = Error
Message class: /SAPAPO/RELEASE -
Message number: 008
Message text: Validity end date before validity start date
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/RELEASE008
- Validity end date before validity start date ?The SAP error message
/SAPAPO/RELEASE008
indicates that there is an issue with the validity dates in the context of Advanced Planning and Optimization (APO) within SAP. Specifically, this error occurs when the validity end date is set before the validity start date for a particular planning object, such as a product or a location.Cause:
The primary cause of this error is a data entry mistake where the end date of a validity period is incorrectly set to a date that is earlier than the start date. This can happen during the creation or modification of master data, such as:
To resolve this error, you need to check and correct the validity dates in the relevant master data. Here are the steps to do so:
Identify the Affected Object: Determine which planning object (e.g., product, location) is causing the error. This information is usually provided in the error message or can be inferred from the context in which the error occurred.
Access the Master Data: Navigate to the relevant transaction in SAP to view the master data for the affected object. This could be done through transactions like /SAPAPO/MAT1
for product master data or /SAPAPO/LOC1
for location master data.
Check Validity Dates: Look for the validity start date and validity end date fields. Ensure that the end date is not earlier than the start date.
Correct the Dates: If you find that the end date is indeed before the start date, update the end date to a valid date that is equal to or later than the start date.
Save Changes: After making the necessary corrections, save the changes to the master data.
Re-test the Process: After correcting the dates, re-run the process that triggered the error to ensure that the issue has been resolved.
If the problem persists after following these steps, it may be necessary to consult with your SAP support team or refer to SAP Notes for further troubleshooting and guidance.
Get instant SAP help. Start your 7-day free trial now.
/SAPAPO/RELEASE007
Select two scheduling agreement releases
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/RELEASE006
Choose an operative delivery schedule
What causes this issue? You want to select a delivery schedule in order to display the release documentation for the corresponding scheduling agreeme...
/SAPAPO/RELEASE009
No suitable scheduling agreement found
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/RELEASE010
Scheduling agreement release not confirmed
What causes this issue? The scheduling agreement release has not been acknowledged since you have neither selected the indicator for full acknowledgm...
Click on this link to search all SAP messages.