How To Fix /SAPAPO/RELEASE009 - No suitable scheduling agreement found


SAP Error Message - Details

  • Message type: E = Error

  • Message class: /SAPAPO/RELEASE -

  • Message number: 009

  • Message text: No suitable scheduling agreement found

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SAPAPO/RELEASE009 - No suitable scheduling agreement found ?

    The SAP error message /SAPAPO/RELEASE009 No suitable scheduling agreement found typically occurs in the context of Advanced Planning and Optimization (APO) when the system is unable to find a valid scheduling agreement for a particular product or location during the planning or release process. This can happen for various reasons, and understanding the cause is crucial for resolving the issue.

    Causes:

    1. Missing Scheduling Agreement: There may not be any scheduling agreements created for the specific product and vendor combination in the system.
    2. Incorrect Validity Dates: The scheduling agreement may exist, but its validity dates do not cover the planning horizon or the date for which the release is being processed.
    3. Incorrect Product or Vendor: The product or vendor specified in the release may not match any existing scheduling agreements.
    4. Status of Scheduling Agreement: The scheduling agreement might be inactive or blocked, preventing it from being used for releases.
    5. Plant or Storage Location Issues: The scheduling agreement may not be assigned to the correct plant or storage location.
    6. Master Data Issues: There could be issues with the master data, such as incorrect material master records or vendor master records.

    Solutions:

    1. Check Scheduling Agreements: Verify that the scheduling agreements exist for the relevant product and vendor combination. You can do this by navigating to the relevant transaction (e.g., ME31L for creating scheduling agreements).
    2. Review Validity Dates: Ensure that the validity dates of the scheduling agreements cover the date for which the release is being processed.
    3. Verify Product and Vendor: Double-check that the product and vendor specified in the release match those in the scheduling agreements.
    4. Check Status: Ensure that the scheduling agreement is active and not blocked. You can check the status in the scheduling agreement details.
    5. Validate Plant and Storage Location: Confirm that the scheduling agreement is assigned to the correct plant and storage location.
    6. Review Master Data: Check the material master and vendor master records for any inconsistencies or errors that could affect the scheduling agreement.

    Related Information:

    • Transaction Codes: Use transaction codes like ME31L (Create Scheduling Agreement), ME32L (Change Scheduling Agreement), and ME33L (Display Scheduling Agreement) to manage scheduling agreements.
    • APO Configuration: Ensure that the APO system is properly configured to recognize and utilize scheduling agreements.
    • Documentation: Refer to SAP documentation or help files for detailed information on scheduling agreements and their configuration in the system.
    • Support: If the issue persists after checking the above points, consider reaching out to your SAP support team or consulting SAP Notes for any known issues or patches related to this error.

    By systematically checking these areas, you should be able to identify and resolve the cause of the error message /SAPAPO/RELEASE009 No suitable scheduling agreement found.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant