How To Fix /SAPAPO/RELEASE011 - Scheduling agreement release confirmed with changed schedule lines


/SAPAPO/RELEASE011 - Overview

  • Message type: E = Error

  • Message class: /SAPAPO/RELEASE -

  • Message number: 011

  • Message text: Scheduling agreement release confirmed with changed schedule lines

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SAPAPO/RELEASE011 - Scheduling agreement release confirmed with changed schedule lines ?
    The SAP error message /SAPAPO/RELEASE011 indicates that a scheduling agreement release has been confirmed, but there are changes in the schedule lines that were not anticipated. This typically occurs in the context of Advanced Planning and Optimization (APO) within SAP, where scheduling agreements are used to manage the delivery of goods over time.
    
    Cause: Changes in Schedule Lines: The most common cause of this error is that the schedule lines in the scheduling agreement have been modified after the release was confirmed. This could happen due to changes in demand, production schedules, or other planning parameters. Data Inconsistency: There may be inconsistencies between the data in the scheduling agreement and the data in the APO system, leading to discrepancies. Master Data Issues: Problems with master data, such as incorrect material master records or vendor information, can also lead to this error. Release Strategy Changes: If there are changes in the release strategy or conditions that

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant