Message type: E = Error
Message class: /SAPAPO/PPM_GENERATE -
Message number: 104
Message text: Not all activities of operation &1 are within a bucket
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/PPM_GENERATE104
- Not all activities of operation &1 are within a bucket ?The SAP error message
/SAPAPO/PPM_GENERATE104
indicates that not all activities of a specific operation are within the defined time bucket during the planning process in SAP Advanced Planning and Optimization (APO). This typically occurs in the context of production planning and scheduling, where operations are expected to fit within specific time frames or buckets for effective resource allocation and scheduling.Cause:
- Time Bucket Misalignment: The operation's activities may extend beyond the defined time bucket, meaning that the start and end times of the activities do not fit within the allocated time frame.
- Resource Constraints: There may be constraints on resources that prevent the activities from being scheduled within the available time buckets.
- Incorrect Planning Parameters: The planning parameters or settings for the operation may not be configured correctly, leading to scheduling issues.
- Capacity Issues: If the capacity of the resources is not sufficient to accommodate the activities within the defined time buckets, this error can occur.
Solution:
- Adjust Time Buckets: Review and adjust the time bucket settings in the planning book or the relevant configuration to ensure that they can accommodate the activities of the operation.
- Re-evaluate Operation Activities: Check the start and end times of the operation's activities. If they are not aligned with the time buckets, consider adjusting them to fit within the defined periods.
- Check Resource Availability: Ensure that the resources required for the operation are available during the time buckets. If necessary, adjust the resource allocation or scheduling.
- Review Planning Parameters: Verify the planning parameters for the operation and make adjustments as needed to ensure they align with the expected scheduling requirements.
- Capacity Planning: Ensure that the capacity planning settings are appropriate and that there is enough capacity to handle the activities within the defined time buckets.
Related Information:
/SAPAPO/PPM
for planning and scheduling or /SAPAPO/DP
for demand planning to analyze and adjust the settings.By following these steps, you should be able to resolve the error and ensure that all activities of the operation fit within the defined time buckets.
Get instant SAP help. Start your 7-day free trial now.
/SAPAPO/PPM_GENERATE103
Enter the number of the SNP plan to be generated
What causes this issue? You want to generate SNP plans from a PP/DS plan, but have not entered an SNP plan.System Response The system issues an erro...
/SAPAPO/PPM_GENERATE102
Enter a PP/DS plan number
What causes this issue? You want to generate SNP plans from a PP/DS plan, but have not entered a PP/DS plan.System Response The system issues an err...
/SAPAPO/PPM_GENERATE105
Not all phases of PI operation &1 are within a bucket
What causes this issue? An SNP plan can only then be generated from a PP/DS plan, when every PI operation falls completely within one bucket (period)...
/SAPAPO/PPM_GENERATE106
PPM &3 setup transition to setup group &1 in matrix &2 not maintained
What causes this issue? You have defined a sequence dependent setup activity in an operation in PPM &V3&. However, in setup matrix &V2&am...
Click on this link to search all SAP messages.