Do you have any question about this error?
Message type: E = Error
Message class: /SAPAPO/PPM_GENERATE -
Message number: 102
Message text: Enter a PP/DS plan number
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/PPM_GENERATE102
- Enter a PP/DS plan number ?The SAP error message
/SAPAPO/PPM_GENERATE102
with the description "Enter a PP/DS plan number" typically occurs in the context of SAP Advanced Planning and Optimization (APO), specifically within the Production Planning and Detailed Scheduling (PP/DS) module. This error indicates that a required input, specifically a PP/DS plan number, has not been provided when attempting to execute a function or transaction that requires it.Cause:
- Missing Input: The most common cause of this error is that the user has not entered a valid PP/DS plan number in the relevant field.
- Incorrect Transaction: The transaction being executed may require a PP/DS plan number, and if the user is in the wrong context or transaction, this error can occur.
- Authorization Issues: In some cases, the user may not have the necessary authorizations to access or view the PP/DS plans, leading to the inability to enter a plan number.
Solution:
- Enter a Valid PP/DS Plan Number: Ensure that you are entering a valid PP/DS plan number in the required field. You can usually find this number in the planning book or by navigating through the relevant planning areas.
- Check Transaction Context: Make sure you are in the correct transaction that requires a PP/DS plan number. If you are unsure, refer to the documentation or help resources for the specific transaction.
- Review Authorizations: If you believe you should have access to the PP/DS plans but are unable to enter a plan number, check with your system administrator to ensure that you have the necessary authorizations.
- Consult Documentation: Refer to SAP documentation or help resources for additional guidance on the specific transaction or function you are trying to execute.
Related Information:
/SAPAPO/PPDS
for planning and scheduling activities.If the issue persists after trying the above solutions, it may be beneficial to reach out to your SAP support team for further assistance.
Get instant SAP help. Start your 7-day free trial now.
/SAPAPO/PPM_GENERATE101
Mode linkage by mode name betw. activities &1 &2 and &3 &4 not considered
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/PPM_GENERATE100
Mode linkage by prim. resource betw. act. &1 &2 and &3 &4 not considered
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/PPM_GENERATE103
Enter the number of the SNP plan to be generated
What causes this issue? You want to generate SNP plans from a PP/DS plan, but have not entered an SNP plan.System Response The system issues an erro...
/SAPAPO/PPM_GENERATE104
Not all activities of operation &1 are within a bucket
What causes this issue? An SNP plan can only be generated from a PP/DS plan if every operation is completely within a single period (bucket), that is...
Click on this link to search all SAP messages.