Do you have any question about this error?
Message type: E = Error
Message class: /SAPAPO/PPM_GENERATE -
Message number: 106
Message text: PPM &3 setup transition to setup group &1 in matrix &2 not maintained
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/PPM_GENERATE106
- PPM &3 setup transition to setup group &1 in matrix &2 not maintained ?The SAP error message
/SAPAPO/PPM_GENERATE106
indicates that there is an issue with the setup transition for a Production Planning and Detailed Scheduling (PP/DS) process in SAP Advanced Planning and Optimization (APO). Specifically, it suggests that the setup transition from one setup group to another in the specified matrix is not maintained.Cause:
Missing Setup Transition: The primary cause of this error is that the setup transition between the specified setup groups is not defined in the system. This means that the system does not know how to transition from one setup to another, which is necessary for planning and scheduling.
Incorrect Configuration: There may be a configuration issue where the setup groups or the matrix itself is not properly defined or linked.
Data Inconsistency: There could be inconsistencies in the master data related to the setup groups or the production process.
Solution:
Define Setup Transition:
- Go to the transaction code
/SAPAPO/PPM
or the relevant configuration area in SAP APO.- Navigate to the setup matrix configuration.
- Ensure that the setup transition between the specified setup groups is defined. You may need to create a new transition if it does not exist.
Check Setup Groups:
- Verify that the setup groups involved in the transition are correctly defined and active.
- Ensure that the setup times and costs are properly maintained for these groups.
Review Matrix Configuration:
- Check the setup matrix configuration to ensure that it is correctly set up and that all necessary transitions are defined.
Data Consistency Check:
- Perform a consistency check on the master data related to the production process to ensure that there are no discrepancies.
Consult Documentation:
- Refer to SAP documentation or help resources for detailed steps on how to maintain setup transitions and setup groups.
Related Information:
/SAPAPO/PPM
for planning and setup matrix maintenance.By following these steps, you should be able to resolve the error and ensure that the setup transitions are properly maintained in your SAP APO system.
Get instant SAP help. Start your 7-day free trial now.
/SAPAPO/PPM_GENERATE105
Not all phases of PI operation &1 are within a bucket
What causes this issue? An SNP plan can only then be generated from a PP/DS plan, when every PI operation falls completely within one bucket (period)...
/SAPAPO/PPM_GENERATE104
Not all activities of operation &1 are within a bucket
What causes this issue? An SNP plan can only be generated from a PP/DS plan if every operation is completely within a single period (bucket), that is...
/SAPAPO/PPM_GENERATE107
Typical order lot size could not be determined
What causes this issue? For SNP PPM generation, the system creates a temporary PP/DS planned order with the <DS:GLOS.F1E65A467095D511AE780800062AF...
/SAPAPO/PPM_GENERATE108
Generation of SNP plan &1 started at &3 hrs on &2
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.