Do you have any question about this error?
Message type: E = Error
Message class: /SAPAPO/PPM_GENERATE -
Message number: 105
Message text: Not all phases of PI operation &1 are within a bucket
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/PPM_GENERATE105
- Not all phases of PI operation &1 are within a bucket ?The SAP error message
/SAPAPO/PPM_GENERATE105
indicates that not all phases of a Production Integration (PI) operation are within a defined bucket in the Advanced Planning and Optimization (APO) module. This typically occurs during the planning process when the system attempts to schedule operations but finds that some phases of the operation extend beyond the time frame of the defined bucket.Cause:
- Bucket Definition: The time buckets defined in the planning book or the planning area may not be large enough to accommodate the entire duration of the operation phases.
- Operation Phases: The operation phases may have been defined with start and end times that exceed the limits of the current bucket.
- Planning Horizon: The planning horizon may not be set correctly, leading to operations being scheduled outside the available time frame.
- Resource Availability: If resources are not available for the entire duration of the operation, it may lead to scheduling issues.
Solution:
- Adjust Bucket Size: Increase the size of the time buckets in the planning book or planning area to ensure that all phases of the operation can fit within a single bucket.
- Review Operation Phases: Check the definitions of the operation phases to ensure that they are correctly defined and do not exceed the bucket limits.
- Modify Planning Horizon: Ensure that the planning horizon is set appropriately to include all necessary operations and their phases.
- Resource Allocation: Verify that the resources required for the operation are available for the entire duration of the operation phases.
- Re-schedule Operations: After making the necessary adjustments, re-schedule the operations to see if the error persists.
Related Information:
/SAPAPO/PPM
for Production Planning and detailed scheduling.If the issue persists after trying the above solutions, it may be beneficial to consult with your SAP support team or refer to SAP community forums for further assistance.
Get instant SAP help. Start your 7-day free trial now.
/SAPAPO/PPM_GENERATE104
Not all activities of operation &1 are within a bucket
What causes this issue? An SNP plan can only be generated from a PP/DS plan if every operation is completely within a single period (bucket), that is...
/SAPAPO/PPM_GENERATE103
Enter the number of the SNP plan to be generated
What causes this issue? You want to generate SNP plans from a PP/DS plan, but have not entered an SNP plan.System Response The system issues an erro...
/SAPAPO/PPM_GENERATE106
PPM &3 setup transition to setup group &1 in matrix &2 not maintained
What causes this issue? You have defined a sequence dependent setup activity in an operation in PPM &V3&. However, in setup matrix &V2&am...
/SAPAPO/PPM_GENERATE107
Typical order lot size could not be determined
What causes this issue? For SNP PPM generation, the system creates a temporary PP/DS planned order with the <DS:GLOS.F1E65A467095D511AE780800062AF...
Click on this link to search all SAP messages.