Message text: Production process model/PDS &1: Cannot be executed
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/PP_OPTIMIZER159
- Production process model/PDS &1: Cannot be executed ?The SAP error message
/SAPAPO/PP_OPTIMIZER159
indicates that there is an issue with the Production Process Model (PDS) for a specific product. This error typically arises in the context of Advanced Planning and Optimization (APO) when the system is unable to execute the PDS for a given product due to various reasons.Causes:
- Missing or Incomplete PDS: The PDS for the specified product may not be created or may be incomplete, lacking necessary details such as operations, resources, or sequences.
- Incorrect Configuration: There may be configuration issues in the PDS, such as incorrect settings for production resources or missing dependencies.
- Resource Availability: The resources required for the production process may not be available or may be incorrectly defined in the system.
- Versioning Issues: The PDS might be in a version that is not active or not properly released for planning.
- Data Consistency Issues: There may be inconsistencies in the master data related to the product, such as incorrect material master data or BOM (Bill of Materials) issues.
Solutions:
- Check PDS Configuration: Verify that the PDS for the product is correctly configured. Ensure that all necessary operations, resources, and sequences are defined.
- Create or Update PDS: If the PDS is missing or incomplete, create or update it in the system. Ensure that all required details are filled in.
- Resource Check: Ensure that the resources required for the production process are available and correctly defined in the system.
- Version Management: Check the versioning of the PDS. Make sure that the correct version is active and released for planning.
- Master Data Consistency: Review the related master data (material master, BOM, etc.) for any inconsistencies or errors that may affect the PDS execution.
- Consult Logs and Traces: Check the system logs and traces for any additional error messages or warnings that may provide more context about the issue.
Related Information:
/SAPAPO/PDS
to view and manage PDS configurations.If the issue persists after following these steps, it may be beneficial to consult with your SAP support team or reach out to SAP support for further assistance.
Get instant SAP help. Start your 7-day free trial now.
/SAPAPO/PP_OPTIMIZER158
Production process model/PDS &1: Fixed resource consumption not allowed
What causes this issue? Production process model &V1& is using resource &V2& that is intended for cross-period lot size planning. How...
/SAPAPO/PP_OPTIMIZER157
PPM/PDS &1 is using more than 1 resource for lot size planning
What causes this issue? Production process model &V1& is using &V2& resources that are intended for cross-period lot size planning. &...
/SAPAPO/PP_OPTIMIZER160
PPM/PDS &3 cannot be run in lot size planning horizon
What causes this issue? There is not sufficient capacity for the fixed resource consumption of PPM &V3& in any of the buckets between 1 and &...
/SAPAPO/PP_OPTIMIZER161
No fixed consumption of resource &2 by production process model/PDS &1
What causes this issue? Production process model &V1& requires resource &V2&, for which cross-period lot size planning has been activ...
Click on this link to search all SAP messages.