Do you have any question about this error?
Message type: E = Error
Message class: /SAPAPO/PP_OPTIMIZER -
Message number: 158
Message text: Production process model/PDS &1: Fixed resource consumption not allowed
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/PP_OPTIMIZER158
- Production process model/PDS &1: Fixed resource consumption not allowed ?The SAP error message
/SAPAPO/PP_OPTIMIZER158
indicates that there is an issue with the production process model (PDS) in the context of the SAP Advanced Planning and Optimization (APO) module. Specifically, the error states that "Fixed resource consumption not allowed" for the specified PDS.Cause:
This error typically arises when:
- Fixed Resource Consumption: The production process model is configured to use fixed resource consumption, but the settings or the context in which it is being used do not allow for this type of consumption. Fixed resource consumption means that a certain amount of resource is consumed regardless of the quantity produced.
- Incompatibility with Planning: The planning scenario or the specific production order may not support fixed resource consumption due to the way the resources or PDS are defined.
- Configuration Issues: There may be configuration issues in the PDS or the resource settings that prevent the use of fixed resource consumption.
Solution:
To resolve this error, you can take the following steps:
Check PDS Configuration:
- Go to the PDS in the SAP system and check the settings related to resource consumption. Ensure that the fixed resource consumption is correctly defined and that it is appropriate for the production process you are trying to execute.
Review Resource Settings:
- Check the resource settings in the APO system. Ensure that the resources involved in the PDS are configured to allow fixed consumption if that is the intended use.
Adjust Planning Parameters:
- If the planning scenario does not support fixed resource consumption, consider adjusting the planning parameters or the production process model to use variable resource consumption instead.
Consult Documentation:
- Review the SAP documentation related to the production process model and resource consumption to ensure that you are following the best practices and guidelines.
Testing:
- After making changes, test the PDS and the planning scenario to ensure that the error is resolved and that the production planning can proceed without issues.
Seek Help from SAP Support:
- If the issue persists after checking the configuration and settings, consider reaching out to SAP support for further assistance. They may provide insights specific to your system configuration.
Related Information:
/SAPAPO/PDS
for managing PDS and /SAPAPO/OPTIMIZER
for optimizer settings.By following these steps, you should be able to identify the root cause of the error and implement a solution to resolve it.
Get instant SAP help. Start your 7-day free trial now.
/SAPAPO/PP_OPTIMIZER157
PPM/PDS &1 is using more than 1 resource for lot size planning
What causes this issue? Production process model &V1& is using &V2& resources that are intended for cross-period lot size planning. &...
/SAPAPO/PP_OPTIMIZER156
Product &2 at location &1: Unneccessary material destruction
What causes this issue? Product &V2& at location &V1& has a limited shelf life and can be externally procured. The costs for destroyi...
/SAPAPO/PP_OPTIMIZER159
Production process model/PDS &1: Cannot be executed
What causes this issue? Production process model &V1& at location &V2& is intended for cross-period lot size planning. It can be star...
/SAPAPO/PP_OPTIMIZER160
PPM/PDS &3 cannot be run in lot size planning horizon
What causes this issue? There is not sufficient capacity for the fixed resource consumption of PPM &V3& in any of the buckets between 1 and &...
Click on this link to search all SAP messages.