How To Fix /SAPAPO/PP_OPTIMIZER157 - PPM/PDS &1 is using more than 1 resource for lot size planning


SAP Error Message - Details

  • Message type: E = Error

  • Message class: /SAPAPO/PP_OPTIMIZER -

  • Message number: 157

  • Message text: PPM/PDS &1 is using more than 1 resource for lot size planning

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SAPAPO/PP_OPTIMIZER157 - PPM/PDS &1 is using more than 1 resource for lot size planning ?

    The SAP error message /SAPAPO/PP_OPTIMIZER157 indicates that the system has encountered an issue with the Production Planning and Detailed Scheduling (PP/DS) optimizer. Specifically, it points out that the Production Planning Model (PPM) or the Product Data Structure (PDS) is configured to use more than one resource for lot size planning, which is not allowed in certain scenarios.

    Cause:

    1. Multiple Resources Defined: The PPM or PDS is set up to use multiple resources for a specific product or production process, which can lead to conflicts in lot size planning.
    2. Configuration Issues: The configuration of the resources in the PDS may not align with the requirements of the lot size planning process.
    3. Resource Grouping: If resources are grouped together in a way that the optimizer cannot determine a single resource for planning, this error may occur.

    Solution:

    1. Review Resource Assignment: Check the PDS and ensure that only one resource is assigned for lot size planning. If multiple resources are necessary, consider whether they can be grouped or if the planning strategy needs to be adjusted.
    2. Adjust PDS Configuration: Modify the PDS to ensure that it complies with the requirements of the lot size planning. This may involve changing the resource assignments or adjusting the production process.
    3. Use Resource Groups: If applicable, consider using resource groups to consolidate resources under a single planning entity, which can help in resolving the conflict.
    4. Check Lot Size Settings: Review the lot size settings in the PPM and ensure they are correctly configured to work with the assigned resources.
    5. Consult Documentation: Refer to SAP documentation or help resources for specific guidelines on configuring PDS and resources for lot size planning.

    Related Information:

    • SAP Notes: Check for any relevant SAP Notes that may address this specific error or provide additional guidance on configuring PDS and resources.
    • Transaction Codes: Use transaction codes like /SAPAPO/PDS to view and edit the PDS, and /SAPAPO/PPM to manage the PPM settings.
    • Testing: After making changes, run a test planning run to ensure that the error is resolved and that the lot size planning works as expected.
    • Consult with Experts: If the issue persists, consider consulting with SAP experts or your internal SAP support team for further assistance.

    By addressing the configuration of resources and ensuring compliance with the lot size planning requirements, you should be able to resolve the error message /SAPAPO/PP_OPTIMIZER157.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker