Message type: E = Error
Message class: /SAPAPO/PP_OPTIMIZER -
Message number: 156
Message text: Product &2 at location &1: Unneccessary material destruction
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/PP_OPTIMIZER156
- Product &2 at location &1: Unneccessary material destruction ?The SAP error message
/SAPAPO/PP_OPTIMIZER156
indicates that there is unnecessary material destruction for a specific product at a given location. This typically occurs in the context of production planning and optimization within the SAP Advanced Planning and Optimization (APO) module.Cause:
The error message suggests that the optimizer has identified a situation where materials are being destroyed unnecessarily during the planning process. This can happen due to several reasons, including:
- Incorrect Planning Parameters: The settings for the planning run may not be configured correctly, leading to inefficient use of materials.
- Material Availability Issues: There may be a mismatch between the available stock and the requirements, causing the optimizer to suggest destruction of materials.
- Production Orders: There might be production orders that are not aligned with the actual demand, leading to excess inventory that is deemed unnecessary.
- Master Data Issues: Problems with master data, such as incorrect BOMs (Bill of Materials) or routing, can lead to unnecessary material destruction.
- Demand Fluctuations: Sudden changes in demand can lead to overproduction and subsequent destruction of excess materials.
Solution:
To resolve this issue, consider the following steps:
- Review Planning Parameters: Check the settings in the planning run to ensure they are appropriate for the current production environment.
- Analyze Demand and Supply: Look at the demand forecasts and supply levels to ensure they are aligned. Adjust forecasts if necessary.
- Check Production Orders: Review the production orders to ensure they are necessary and aligned with actual demand. Cancel or adjust any unnecessary orders.
- Examine Master Data: Verify the accuracy of master data, including BOMs and routing. Make corrections as needed to ensure they reflect the current production processes.
- Run the Optimizer Again: After making adjustments, run the optimizer again to see if the issue persists.
- Consult Documentation: Refer to SAP documentation or support for specific guidelines related to the error message and its resolution.
Related Information:
/SAPAPO/OPTIMIZER
for running the optimizer and /SAPAPO/MC90
for checking planning results.By following these steps, you should be able to identify the root cause of the unnecessary material destruction and implement a solution to prevent it in the future.
Get instant SAP help. Start your 7-day free trial now.
/SAPAPO/PP_OPTIMIZER155
Product &2 in location &1: Safety stock contradicts maximum stock
What causes this issue? A safety stock of &V3& was specified for product &V2& at location &V1&. This is higher than the maxim...
/SAPAPO/PP_OPTIMIZER154
Resource &1: incomplete cost function for capacity increase
What causes this issue? The piecewise linear cost function for increasing the capacity of resource &V1& was only defined for an increase of a...
/SAPAPO/PP_OPTIMIZER157
PPM/PDS &1 is using more than 1 resource for lot size planning
What causes this issue? Production process model &V1& is using &V2& resources that are intended for cross-period lot size planning. &...
/SAPAPO/PP_OPTIMIZER158
Production process model/PDS &1: Fixed resource consumption not allowed
What causes this issue? Production process model &V1& is using resource &V2& that is intended for cross-period lot size planning. How...