Message type: E = Error
Message class: /SAPAPO/PP_OPTIMIZER -
Message number: 161
Message text: No fixed consumption of resource &2 by production process model/PDS &1
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/PP_OPTIMIZER161
- No fixed consumption of resource &2 by production process model/PDS &1 ?The SAP error message /SAPAPO/PP_OPTIMIZER161 indicates that there is an issue with the fixed consumption of a resource in the Production Process Model (PDS) in SAP Advanced Planning and Optimization (APO). Specifically, it means that the system is unable to find a fixed consumption setting for the specified resource in the PDS.
Cause: Missing Fixed Consumption Data: The resource specified in the error message does not have fixed consumption data defined in the PDS. Incorrect Configuration: The configuration of the resource or the PDS may not be set up correctly, leading to the absence of fixed consumption settings. Resource Not Assigned: The resource may not be properly assigned to the production process model or may not be available for the specific production process. Data Inconsistency: There may be inconsistencies in the master data or configuration settings related to the resource or PDS.
Solution: Check PDS Configuration: Go to the PDS in the SAP APO system and check the
Get instant SAP help. Sign up for our Free Essentials Plan.
/SAPAPO/PP_OPTIMIZER160
PPM/PDS &3 cannot be run in lot size planning horizon
What causes this issue? There is not sufficient capacity for the fixed resource consumption of PPM &V3& in any of the buckets between 1 and &...
/SAPAPO/PP_OPTIMIZER159
Production process model/PDS &1: Cannot be executed
What causes this issue? Production process model &V1& at location &V2& is intended for cross-period lot size planning. It can be star...
/SAPAPO/PP_OPTIMIZER162
Production process model/PDS &1: Cost function is missing
What causes this issue? Cross-period lot size planning is active for production process model &V1&. In this instance, the SNP optimizer would...
/SAPAPO/PP_OPTIMIZER163
Product &1 at location &2: Dynamic safety stock > shelf life
What causes this issue? You want to have a dynamic safety stock of &V3& days for product &V1& at location &V2&. This is longe...
Click on this link to search all SAP messages.