How To Fix /SAPAPO/DEPL_MESS625 - Planning start date &1 (end lead time check horizon)


/SAPAPO/DEPL_MESS625 - Overview

  • Message type: E = Error

  • Message class: /SAPAPO/DEPL_MESS -

  • Message number: 625

  • Message text: Planning start date &1 (end lead time check horizon)

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SAPAPO/DEPL_MESS625 - Planning start date &1 (end lead time check horizon) ?
    The SAP error message /SAPAPO/DEPL_MESS625 indicates that the planning start date you are trying to use is beyond the end of the lead time check horizon. This typically occurs in the context of Advanced Planning and Optimization (APO) in SAP, particularly when dealing with deployment or planning processes.
    
    Cause: The error is triggered when: The planning start date you have specified is later than the end of the lead time check horizon defined in the system. The lead time check horizon is a parameter that determines how far into the future planning can be performed. If your planning start date exceeds this horizon, the system will not allow the operation to proceed.
    Solution: To resolve this error, you can take the following steps: Check the Planning Start Date: Ensure that the planning start date you are using is within the acceptable range defined by the lead time check horizon. Adjust the Lead Time Check Horizon: You may need to

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author