Do you have any question about this error?
Message type: E = Error
Message class: /SAPAPO/DEPL_MESS -
Message number: 623
Message text: Demand Item Change Date &1 changed during lead time check horizon
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/DEPL_MESS623
- Demand Item Change Date &1 changed during lead time check horizon ?The SAP error message
/SAPAPO/DEPL_MESS623
indicates that there has been a change to the demand item change date during the lead time check horizon in the Advanced Planning and Optimization (APO) module. This typically occurs in the context of demand planning and deployment processes.Cause:
- Change in Demand Date: The demand item’s change date has been modified after the lead time check has already been performed. This can happen if there are updates to the demand forecast or changes in the planning parameters.
- Lead Time Check Horizon: The lead time check horizon is the period during which the system checks for changes to demand items. If a change occurs within this horizon, it can trigger this error message.
- Configuration Issues: There may be issues with the configuration of the planning parameters or settings that govern how demand changes are handled.
Solution:
- Review Changes: Check the changes made to the demand item. Ensure that any modifications to the demand date are intentional and necessary.
- Adjust Lead Time Check Horizon: If feasible, consider adjusting the lead time check horizon to accommodate changes. This can be done in the APO configuration settings.
- Re-run Planning: After making necessary adjustments, re-run the planning process to ensure that the changes are reflected correctly and that the error does not persist.
- Check Configuration: Review the configuration settings related to demand planning and lead time checks to ensure they are set up correctly.
- Consult Documentation: Refer to SAP documentation or notes related to this error message for any specific recommendations or patches that may address the issue.
Related Information:
/SAPAPO/DP
for demand planning or /SAPAPO/SDP94
for the planning book to analyze the demand items.If the issue persists after following these steps, it may be beneficial to engage with SAP support or consult with a technical expert familiar with your specific APO configuration.
Get instant SAP help. Start your 7-day free trial now.
/SAPAPO/DEPL_MESS622
Roll-Up Schedule Date &1 before lead time check horizon
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/DEPL_MESS621
Roll-Up Schedule Date &1 inside lead time check horizon
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/DEPL_MESS624
Demand Item Change Date &1 changed before lead time check horizon
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/DEPL_MESS625
Planning start date &1 (end lead time check horizon)
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.