Message type: E = Error
Message class: /SAPAPO/DEPL_MESS -
Message number: 624
Message text: Demand Item Change Date &1 changed before lead time check horizon
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/DEPL_MESS624
- Demand Item Change Date &1 changed before lead time check horizon ?The SAP error message /SAPAPO/DEPL_MESS624 indicates that there is an issue with the demand item change date in relation to the lead time check horizon in the Advanced Planning and Optimization (APO) module. This error typically arises when a demand item is modified in a way that violates the lead time constraints set in the system.
Cause: Change Date Violation: The demand item change date is set to a date that is earlier than the lead time check horizon. This means that the system is trying to process a change that is not allowed because it falls within the lead time period.
Configuration Issues: The lead time settings in the APO system may not be configured correctly, leading to discrepancies in how changes are processed. Planning Parameters: The planning parameters for the product or location may not align with the changes being made, causing the system to reject the change.
Solution: Adjust Change Date: Ensure that
Get instant SAP help. Sign up for our Free Essentials Plan.
/SAPAPO/DEPL_MESS623
Demand Item Change Date &1 changed during lead time check horizon
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/DEPL_MESS622
Roll-Up Schedule Date &1 before lead time check horizon
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/DEPL_MESS625
Planning start date &1 (end lead time check horizon)
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/DEPL_MESS626
Prepare trigger &1 for product &2, location &3
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.